2010Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIERequires access

Results, status, and plans for the James Webb Space Telescope optical telescope element

Lee D. Feinberg, Ritva Keski-Kuha, Charlie Atkinson, S. Texter

Open publisher page 2 citations

Abstract

The James Webb Space Telescope (JWST) Optical Telescope Element has completed its Critical Design Review and is well into fabrication. This paper will summarize efforts to date in the design, manufacturing and planning for integration and testing. This will include a top level summary of mirror performance to date, hardware results, and planning status for the integration and testing program. The future plans for manufacturing, assembly, alignment and testing will also be summarized at a top level.

About this research paper

What this paper is about

The James Webb Space Telescope (JWST) Optical Telescope Element has completed its Critical Design Review and is well into fabrication. This paper will summarize efforts to date in the design, manufacturing and planning for integration and testing. This will include a top level summary of mirror performance to date, hardware results, and planning status for the integration and testing program. The future plans for manufacturing, assembly, alignment and testing will also be summarized at a top level.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The James Webb Space Telescope (JWST) Optical Telescope Element has completed its Critical Design Review and is well into fabrication. This paper will summarize efforts to date in the design, manufacturing and planning for integration and testing. This will include a top level summary of mirror performance to date, hardware results, and planning status for the integration and testing program. The future plans for manufacturing, assembly, alignment and testing will also be summarized at a top level.

Key concepts: James Webb Space Telescope, Telescope, Spitzer Space Telescope, Computer science, Integration testing, Systems engineering, Space (punctuation), Optics

Related papers

Back to paper searchBrowse research topicsOriginal source
Results, status, and plans for the James Webb Space Telescope optical telescope element — Research Paper | ScholarLens