Results, status, and plans for the James Webb Space Telescope optical telescope element
Lee D. Feinberg, Ritva Keski-Kuha, Charlie Atkinson, S. Texter
Abstract
Lee D. Feinberg, Ritva Keski-Kuha, Charlie Atkinson, S. Texter
Abstract
The James Webb Space Telescope (JWST) Optical Telescope Element has completed its Critical Design Review and is well into fabrication. This paper will summarize efforts to date in the design, manufacturing and planning for integration and testing. This will include a top level summary of mirror performance to date, hardware results, and planning status for the integration and testing program. The future plans for manufacturing, assembly, alignment and testing will also be summarized at a top level.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The James Webb Space Telescope (JWST) Optical Telescope Element has completed its Critical Design Review and is well into fabrication. This paper will summarize efforts to date in the design, manufacturing and planning for integration and testing. This will include a top level summary of mirror performance to date, hardware results, and planning status for the integration and testing program. The future plans for manufacturing, assembly, alignment and testing will also be summarized at a top level.
Key concepts: James Webb Space Telescope, Telescope, Spitzer Space Telescope, Computer science, Integration testing, Systems engineering, Space (punctuation), Optics