2015Mathematical Problems in EngineeringOpen access

Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy

Qiwei Hu, Yongsheng Bai, Jianmin Zhao, Wenbin Cao

Open full text 34 citations

Abstract

In maintenance practice, there is such a situation where the spare parts replacement should be carried out at the scheduling time of calendar or usage for whichever comes first. The issue of two-dimensional preventive maintenance usually was not addressed by traditional methods, and at present, few studies were focused on this very topic. Based on these considerations, this paper presented the two-dimensional preventive policy where replacements of spare parts are based on both calendar time and usage time. A novel model was developed to forecast spare parts demands under two-dimensional preventive maintenance policy, and a discrete algorithm was presented for solving the mathematical model. A case study was given to demonstrate its applicability and validity, and it was showed that the presented model can be used to forecast spare parts demands as well as to optimize spare parts and preventive maintenance jointly.

Open-access reader

About this research paper

What this paper is about

In maintenance practice, there is such a situation where the spare parts replacement should be carried out at the scheduling time of calendar or usage for whichever comes first. The issue of two-dimensional preventive maintenance usually was not addressed by traditional methods, and at present, few studies were focused on this very topic. Based on these considerations, this paper presented the two-dimensional preventive policy where replacements of spare parts are based on both calendar time and usage time. A novel model was developed to forecast spare parts demands under two-dimensional preventive maintenance policy, and a discrete algorithm was presented for solving the mathematical model. A case study was given to demonstrate its applicability and validity, and it was showed that the presented model can be used to forecast spare parts demands as well as to optimize spare parts and preventive maintenance jointly.

Why it matters

OpenAlex reports 34 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In maintenance practice, there is such a situation where the spare parts replacement should be carried out at the scheduling time of calendar or usage for whichever comes first. The issue of two-dimensional preventive maintenance usually was not addressed by traditional methods, and at present, few studies were focused on this very topic. Based on these considerations, this paper presented the two-dimensional preventive policy where replacements of spare parts are based on both calendar time and usage time. A novel model was developed to forecast spare parts demands under two-dimensional preventive maintenance policy, and a discrete algorithm was presented for solving the mathematical model. A case study was given to demonstrate its applicability and validity, and it was showed that the presented model can be used to forecast spare parts demands as well as to optimize spare parts and preventive maintenance jointly.

Key concepts: Spare part, Preventive maintenance, Scheduling (production processes), Computer science, Reliability engineering, Operations research, Spare time, Planned maintenance

Related papers

Back to paper searchBrowse research topicsOriginal source
Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy — Research Paper | ScholarLens