Electrical Submersible Pumps for the Montrose Field - Their Application and Post Operational Experience

Alex Way, M. A. Hewett

Open publisher page 1 citations

Abstract

ABSTRACT The North Sea Montrose Field has been on production since July 1976. Since mid 1979 artificial lift has been necessary on certain wells, due to their high water cuts. This paper reviews the application of electrical submersible pumps for artificial lift on Montrose Field, the choice and sizing of equipment, completion design and the installation procedure. Problems encountered and post-appraisal of the electrical submersible pump installations, together with any changes made to remedy the problems and improve pump performance, are discussed. Specific items covered include the experience with rotary gas separators, the run life and performance of submersible pumps, and the economics of submersible pumps for artificial lift. Submersible pumps have been used to maintain production which has decreased on certain wells in the Montrose Field due to increasing water cuts. The submersible pumps have been run in high angle holes (65°), at measured depths of approximately 10,000 ft., with production of high GOR (900 SCF/BBL) and in the presence of sand. The reservoir pressure is a maximum of 3000 psig and the reservoir temperature is 255°F. Experience gained by Amoco with submersible pumps in the offshore environment of the North Sea is applicable to other operators and their artificial lift requirements, especially where high production rates and hostile environments are encountered. It has been shown to date that electrical submersible pumps can be run in the North Sea, but with only limited success. Advantages exhibited over gas lift (presently the only viable alternative to electrical submersible pumps in the North Sea), are the comparatively low initial installation costs and an application on a well by well basis, rather than a field wide basis; however, these advantages can only be achieved provided a satisfactory pump run life is obtained. A total of ten electrical submersible pumps have been installed on the Montrose Field, with an average run life of approximately four weeks, and a maximum run life of approximately three months.

About this research paper

What this paper is about

ABSTRACT The North Sea Montrose Field has been on production since July 1976. Since mid 1979 artificial lift has been necessary on certain wells, due to their high water cuts. This paper reviews the application of electrical submersible pumps for artificial lift on Montrose Field, the choice and sizing of equipment, completion design and the installation procedure. Problems encountered and post-appraisal of the electrical submersible pump installations, together with any changes made to remedy the problems and improve pump performance, are discussed. Specific items covered include the experience with rotary gas separators, the run life and performance of submersible pumps, and the economics of submersible pumps for artificial lift. Submersible pumps have been used to maintain production which has decreased on certain wells in the Montrose Field due to increasing water cuts. The submersible pumps have been run in high angle holes (65°), at measured depths of approximately 10,000 ft., with production of high GOR (900 SCF/BBL) and in the presence of sand. The reservoir pressure is a maximum of 3000 psig and the reservoir temperature is 255°F. Experience gained by Amoco with submersible pumps in the offshore environment of the North Sea is applicable to other operators and their artificial lift requirements, especially where high production rates and hostile environments are encountered. It has been shown to date that electrical submersible pumps can be run in the North Sea, but with only limited success. Advantages exhibited over gas lift (presently the only viable alternative to electrical submersible pumps in the North Sea), are the comparatively low initial installation costs and an application on a well by well basis, rather than a field wide basis; however, these advantages can only be achieved provided a satisfactory pump run life is obtained. A total of ten electrical submersible pumps have been installed on the Montrose Field, with an average run life of approximately four weeks, and a maximum run life of approximately three months.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

ABSTRACT The North Sea Montrose Field has been on production since July 1976. Since mid 1979 artificial lift has been necessary on certain wells, due to their high water cuts. This paper reviews the application of electrical submersible pumps for artificial lift on Montrose Field, the choice and sizing of equipment, completion design and the installation procedure. Problems encountered and post-appraisal of the electrical submersible pump installations, together with any changes made to remedy the problems and improve pump performance, are discussed. Specific items covered include the experience with rotary gas separators, the run life and performance of submersible pumps, and the economics of submersible pumps for artificial lift. Submersible pumps have been used to maintain production which has decreased on certain wells in the Montrose Field due to increasing water cuts. The submersible pumps have been run in high angle holes (65°), at measured depths of approximately 10,000 ft., with production of high GOR (900 SCF/BBL) and in the presence of sand. The reservoir pressure is a maximum of 3000 psig and the reservoir temperature is 255°F. Experience gained by Amoco with submersible pumps in the offshore environment of the North Sea is applicable to other operators and their artificial lift requirements, especially where high production rates and hostile environments are encountered. It has been shown to date that electrical submersible pumps can be run in the North Sea, but with only limited success. Advantages exhibited over gas lift (presently the only viable alternative to electrical submersible pumps in the North Sea), are the comparatively low initial installation costs and an application on a well by well basis, rather than a field wide basis; however, these advantages can only be achieved provided a satisfactory pump run life is obtained. A total of ten electrical submersible pumps have been installed on the Montrose Field, with an average run life of approximately four weeks, and a maximum run life of approximately three months.

Key concepts: Submersible pump, Artificial lift, Lift (data mining), Marine engineering, Sizing, Submarine pipeline, Engineering, Petroleum engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Electrical Submersible Pumps for the Montrose Field - Their Application and Post Operational Experience — Research Paper | ScholarLens