Highway Bridge Construction Process Simulation Base on 4D Visualization

ChengHan Zhou, Weidong Wang

Open publisher page 9 citations

Abstract

It is very important that 4D visualization technology is applied in bridge construction management since traditional tools of construction management cannot present intuitive construction progress. This study established a 4D simulation model for bridge construction management by integrating the construction schedule and resource consumption progress with the bridge 3D model. Based on this model, a 4D simulation system of bridge construction was developed. With this system, a dynamic simulation of bridge construction schedule and resource requirements were realized, which make it more convenient for the users to forecast and inquire construction progress and resource consumption intensively in a visual environment. In brief, it realized visualization management and control in bridge construction. The Bridge Construction 4D Simulation System was applied in the construction management of DaWu River Bridge, a 340m pre-stressed concrete continuous rigid frame bridge.

About this research paper

What this paper is about

It is very important that 4D visualization technology is applied in bridge construction management since traditional tools of construction management cannot present intuitive construction progress. This study established a 4D simulation model for bridge construction management by integrating the construction schedule and resource consumption progress with the bridge 3D model. Based on this model, a 4D simulation system of bridge construction was developed. With this system, a dynamic simulation of bridge construction schedule and resource requirements were realized, which make it more convenient for the users to forecast and inquire construction progress and resource consumption intensively in a visual environment. In brief, it realized visualization management and control in bridge construction. The Bridge Construction 4D Simulation System was applied in the construction management of DaWu River Bridge, a 340m pre-stressed concrete continuous rigid frame bridge.

Why it matters

OpenAlex reports 9 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It is very important that 4D visualization technology is applied in bridge construction management since traditional tools of construction management cannot present intuitive construction progress. This study established a 4D simulation model for bridge construction management by integrating the construction schedule and resource consumption progress with the bridge 3D model. Based on this model, a 4D simulation system of bridge construction was developed. With this system, a dynamic simulation of bridge construction schedule and resource requirements were realized, which make it more convenient for the users to forecast and inquire construction progress and resource consumption intensively in a visual environment. In brief, it realized visualization management and control in bridge construction. The Bridge Construction 4D Simulation System was applied in the construction management of DaWu River Bridge, a 340m pre-stressed concrete continuous rigid frame bridge.

Key concepts: Bridge (graph theory), Visualization, Schedule, Process (computing), Computer science, Construction management, Resource (disambiguation), Resource consumption