Hanford Facility Resource Conservation and Recovery Act Permit General Inspection Plan
Westinghouse Hanford Co., Richland, WA (United States), D Beagles, USDOE, Washington, DC (United States) (US)
Abstract
Westinghouse Hanford Co., Richland, WA (United States), D Beagles, USDOE, Washington, DC (United States) (US)
Abstract
This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility. RCRA includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 areas and the banks of the Columbia River. This plan meets the RCRA requirements and also provides for scheduling of inspections and defines general and specific items to be noted during the inspections.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility. RCRA includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 areas and the banks of the Columbia River. This plan meets the RCRA requirements and also provides for scheduling of inspections and defines general and specific items to be noted during the inspections.
Key concepts: Plan (archaeology), Resource Conservation and Recovery Act, Hanford Site, Waste management, Operations management, Environmental science, Business, Engineering