Slab Track for Shared Freight and High Speed Passenger Service

Dingqing Li, David N. Bilow, Ted Sussmann

Open publisher page 5 citations

Abstract

This paper presents design and construction details of two types of slab track installed at the Facility for Accelerated Service Testing (FAST), near Pueblo, Colorado. Direct fixation slab track (DFST) and independent dual block track (IDBT) were installed on a 5-degree curve with 4-inch superelevation. The slab track test section was 500 feet long, consisting of 250 feet of DFST and 250 feet of IDBT. The slab track test section was designed to support 39-ton axle load train operations, while maintaining track geometry for high-speed track standards.

About this research paper

What this paper is about

This paper presents design and construction details of two types of slab track installed at the Facility for Accelerated Service Testing (FAST), near Pueblo, Colorado. Direct fixation slab track (DFST) and independent dual block track (IDBT) were installed on a 5-degree curve with 4-inch superelevation. The slab track test section was 500 feet long, consisting of 250 feet of DFST and 250 feet of IDBT. The slab track test section was designed to support 39-ton axle load train operations, while maintaining track geometry for high-speed track standards.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents design and construction details of two types of slab track installed at the Facility for Accelerated Service Testing (FAST), near Pueblo, Colorado. Direct fixation slab track (DFST) and independent dual block track (IDBT) were installed on a 5-degree curve with 4-inch superelevation. The slab track test section was 500 feet long, consisting of 250 feet of DFST and 250 feet of IDBT. The slab track test section was designed to support 39-ton axle load train operations, while maintaining track geometry for high-speed track standards.

Key concepts: Slab, Track (disk drive), Block (permutation group theory), Axle, Structural engineering, Computer science, Geology, Engineering