2003•European railway reviewRequires access

SLAB TRACK FOR HIGH SPEED LINES IN GERMANY

E Jaensch

Open publisher page 0 citations

Abstract

The history of slab track construction in Germany is described. A total of 155 km of double-track slab track has been constructed on the Cologne-Rhine/Main 300 km/hour high-speed line. The design parameters that led to slab track being chosen over ballast track for the high-speed line are outlined. Construction of the slab track on the new line is discussed with reference to the rail supports, concrete-embedded two-block sleepers, the Rheda and Zueblin systems, turnouts, bridges and expansion joints. The other slab track systems used in the high-speed network of DB Netz AG are outlined.

About this research paper

What this paper is about

The history of slab track construction in Germany is described. A total of 155 km of double-track slab track has been constructed on the Cologne-Rhine/Main 300 km/hour high-speed line. The design parameters that led to slab track being chosen over ballast track for the high-speed line are outlined. Construction of the slab track on the new line is discussed with reference to the rail supports, concrete-embedded two-block sleepers, the Rheda and Zueblin systems, turnouts, bridges and expansion joints. The other slab track systems used in the high-speed network of DB Netz AG are outlined.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The history of slab track construction in Germany is described. A total of 155 km of double-track slab track has been constructed on the Cologne-Rhine/Main 300 km/hour high-speed line. The design parameters that led to slab track being chosen over ballast track for the high-speed line are outlined. Construction of the slab track on the new line is discussed with reference to the rail supports, concrete-embedded two-block sleepers, the Rheda and Zueblin systems, turnouts, bridges and expansion joints. The other slab track systems used in the high-speed network of DB Netz AG are outlined.

Key concepts: Slab, Track (disk drive), Ballast, Railway line, Line (geometry), Engineering, Block (permutation group theory), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
SLAB TRACK FOR HIGH SPEED LINES IN GERMANY — Research Paper | ScholarLens