Study on Construction of Long Span and Soft Rock Tunnel with Numerical Simulation
Bin Zhu, Xiao Jing Shi
Abstract
Bin Zhu, Xiao Jing Shi
Abstract
With characteristics of the long span and soft rock tunnel, this paper analyzes the main factors affecting tunnel stable on the basis of the way of tunnel excavation method. The large finite element program is used in research of a tunnel, with a numerical simulation of two different way, top heading and bench method and double side drift method. From the result of stress field and displacement field of the tunnel , some useful conclusion are obtained, that double side drift method is appropriate for this kind of soft rock tunnel.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
With characteristics of the long span and soft rock tunnel, this paper analyzes the main factors affecting tunnel stable on the basis of the way of tunnel excavation method. The large finite element program is used in research of a tunnel, with a numerical simulation of two different way, top heading and bench method and double side drift method. From the result of stress field and displacement field of the tunnel , some useful conclusion are obtained, that double side drift method is appropriate for this kind of soft rock tunnel.
Key concepts: Excavation, Geotechnical engineering, Displacement (psychology), Heading (navigation), Span (engineering), Structural engineering, Engineering, Stress field