Combination of Project Cost Forecasts in Earned Value Management
Byung-Cheol Kim, Kenneth F. Reinschmidt
Abstract
Byung-Cheol Kim, Kenneth F. Reinschmidt
Abstract
Reliable cost estimates are essential for effective project control and the management of cash flows within the project and at the company level. Conventional approaches to project cost forecasting, which rely on detailed information developed for a specific project (the bottom-up estimate or inside view), often result in cost overruns. It is argued here that the inside-view project cost estimates should be adjusted by combining them with the outside (or top-down) view of the project, which is based on statistical models of historical project data. This paper presents a probabilistic cost forecasting method and a framework for an adaptive combination of the inside view and the outside view forecasts of project cost using Bayesian inference and the Bayesian model averaging technique. During the project execution phase, the Bayesian adaptive forecasting method incorporates into the predictions the actual performance data from earned value management and revises preproject cost estimates, making full use of the available information. Qualitative examples are presented to demonstrate the validity of the proposed method as a tool for effective project cost prediction and control.
OpenAlex reports 79 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Reliable cost estimates are essential for effective project control and the management of cash flows within the project and at the company level. Conventional approaches to project cost forecasting, which rely on detailed information developed for a specific project (the bottom-up estimate or inside view), often result in cost overruns. It is argued here that the inside-view project cost estimates should be adjusted by combining them with the outside (or top-down) view of the project, which is based on statistical models of historical project data. This paper presents a probabilistic cost forecasting method and a framework for an adaptive combination of the inside view and the outside view forecasts of project cost using Bayesian inference and the Bayesian model averaging technique. During the project execution phase, the Bayesian adaptive forecasting method incorporates into the predictions the actual performance data from earned value management and revises preproject cost estimates, making full use of the available information. Qualitative examples are presented to demonstrate the validity of the proposed method as a tool for effective project cost prediction and control.
Key concepts: Earned value management, Cost contingency, Computer science, Project management, Cost estimate, Basis of estimate, Probabilistic logic, Operations research