Design and Evaluation of Accelerated Bridge Construction

Mike D LaViolette, Norman L. McDonald, Ahmad Abu-Hawash, James S. Nelson, Anthony Samuelson

Open publisher page 0 citations

Abstract

New bridge systems are needed that will allow components to be fabricated off-site and moved into place for quick assembly while maintaining traffic flow. Depending on the specific site conditions, the use of prefabricated bridge systems can minimize traffic disruption, improve work zone safety, minimize disruption to the environment, improve constructibility, increase quality, and lower life-cycle costs. This technology is applicable and needed for both existing and new bridge construction. The Federal Highway Administration (FHWA) has recently developed a program to promote accelerated construction through the use of precast bridge elements. This paper will present the design and construction process for the first application of truly accelerated bridge projects in the state of Iowa. The FHWA Innovative Bridge Research and Construction program has awarded funding for two bridges that utilize precast, high-performance concrete elements to be constructed in Boone County and Madison County, Iowa. Researchers from the Bridge Engineering Center at Iowa State University will install instrumentation and monitor the structural behavior of these two bridges following construction. A discussion of the structural instrumentation and monitoring of these innovative bridges will be presented.

About this research paper

What this paper is about

New bridge systems are needed that will allow components to be fabricated off-site and moved into place for quick assembly while maintaining traffic flow. Depending on the specific site conditions, the use of prefabricated bridge systems can minimize traffic disruption, improve work zone safety, minimize disruption to the environment, improve constructibility, increase quality, and lower life-cycle costs. This technology is applicable and needed for both existing and new bridge construction. The Federal Highway Administration (FHWA) has recently developed a program to promote accelerated construction through the use of precast bridge elements. This paper will present the design and construction process for the first application of truly accelerated bridge projects in the state of Iowa. The FHWA Innovative Bridge Research and Construction program has awarded funding for two bridges that utilize precast, high-performance concrete elements to be constructed in Boone County and Madison County, Iowa. Researchers from the Bridge Engineering Center at Iowa State University will install instrumentation and monitor the structural behavior of these two bridges following construction. A discussion of the structural instrumentation and monitoring of these innovative bridges will be presented.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

New bridge systems are needed that will allow components to be fabricated off-site and moved into place for quick assembly while maintaining traffic flow. Depending on the specific site conditions, the use of prefabricated bridge systems can minimize traffic disruption, improve work zone safety, minimize disruption to the environment, improve constructibility, increase quality, and lower life-cycle costs. This technology is applicable and needed for both existing and new bridge construction. The Federal Highway Administration (FHWA) has recently developed a program to promote accelerated construction through the use of precast bridge elements. This paper will present the design and construction process for the first application of truly accelerated bridge projects in the state of Iowa. The FHWA Innovative Bridge Research and Construction program has awarded funding for two bridges that utilize precast, high-performance concrete elements to be constructed in Boone County and Madison County, Iowa. Researchers from the Bridge Engineering Center at Iowa State University will install instrumentation and monitor the structural behavior of these two bridges following construction. A discussion of the structural instrumentation and monitoring of these innovative bridges will be presented.

Key concepts: Precast concrete, Bridge (graph theory), Engineering, Construction engineering, Scope (computer science), Transport engineering, Work zone, Instrumentation (computer programming)