2002•Journal of the Chinese Institute of EngineersRequires access

Time‐dependent displacement of diaphragm wall induced by soil creep

Horn‐Da Lin, Chang‐Yu Ou, Chien‐Chih Wang

Open publisher page 20 citations

Abstract

This paper presents the time‐dependent performance of an well‐instrumented excavation case using the top‐down construction method. Studies show that this time‐dependent wall displacement is mostly likely due to undrained creep of clayey soils surrounding the excavation. In other words, soil creep may make significant contributions to diaphragm wall displacement and ground settlement in a deep excavation project in soft clay strata. The extra movement was found to be about 30% of the total displacement. This paper also presents a quantitative method to evaluate this creep effect. The essence of this method is to incorporate a time‐dependent soil modulus that can reflect the effects of soil creep. This method has been shown to give reasonable results in the field and the laboratory.

About this research paper

What this paper is about

This paper presents the time‐dependent performance of an well‐instrumented excavation case using the top‐down construction method. Studies show that this time‐dependent wall displacement is mostly likely due to undrained creep of clayey soils surrounding the excavation. In other words, soil creep may make significant contributions to diaphragm wall displacement and ground settlement in a deep excavation project in soft clay strata. The extra movement was found to be about 30% of the total displacement. This paper also presents a quantitative method to evaluate this creep effect. The essence of this method is to incorporate a time‐dependent soil modulus that can reflect the effects of soil creep. This method has been shown to give reasonable results in the field and the laboratory.

Why it matters

OpenAlex reports 20 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents the time‐dependent performance of an well‐instrumented excavation case using the top‐down construction method. Studies show that this time‐dependent wall displacement is mostly likely due to undrained creep of clayey soils surrounding the excavation. In other words, soil creep may make significant contributions to diaphragm wall displacement and ground settlement in a deep excavation project in soft clay strata. The extra movement was found to be about 30% of the total displacement. This paper also presents a quantitative method to evaluate this creep effect. The essence of this method is to incorporate a time‐dependent soil modulus that can reflect the effects of soil creep. This method has been shown to give reasonable results in the field and the laboratory.

Key concepts: Creep, Geotechnical engineering, Displacement (psychology), Excavation, Settlement (finance), Diaphragm (acoustics), Modulus, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Time‐dependent displacement of diaphragm wall induced by soil creep — Research Paper | ScholarLens