Research on Risk Analysis for Construction Project Schedule Based on Flexible Network Simulation

Zhong Zuo-wei, Bao Xi, Qiu-Guo Huang, LI Fangzhen

Open publisher page 1 citations

Abstract

Construction projects are complex in nature and have many inherent uncertainties. These uncertainties have a very significant effect on project. The flexible network simulation based on SWARM platform is applied to study the construction project schedule risk in this research, which makes lots of improves to the current model. Differing from the traditional PERT network planning considering only single critical path, this research introduces the uncertainties to the simulation duration and critical path. Then the statistical analysis is adopted to decide the simulation running times, and the completion probability and risk degree is obtained after that. In addition, the model identify the high risk working procedure according to the activity critical index (ACI), what is more important is that the new method computing safe use rate of path float. The case study indicates that the method can provide more information about construction management to decision-makers and managers who can predominate project risk as a whole

About this research paper

What this paper is about

Construction projects are complex in nature and have many inherent uncertainties. These uncertainties have a very significant effect on project. The flexible network simulation based on SWARM platform is applied to study the construction project schedule risk in this research, which makes lots of improves to the current model. Differing from the traditional PERT network planning considering only single critical path, this research introduces the uncertainties to the simulation duration and critical path. Then the statistical analysis is adopted to decide the simulation running times, and the completion probability and risk degree is obtained after that. In addition, the model identify the high risk working procedure according to the activity critical index (ACI), what is more important is that the new method computing safe use rate of path float. The case study indicates that the method can provide more information about construction management to decision-makers and managers who can predominate project risk as a whole

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction projects are complex in nature and have many inherent uncertainties. These uncertainties have a very significant effect on project. The flexible network simulation based on SWARM platform is applied to study the construction project schedule risk in this research, which makes lots of improves to the current model. Differing from the traditional PERT network planning considering only single critical path, this research introduces the uncertainties to the simulation duration and critical path. Then the statistical analysis is adopted to decide the simulation running times, and the completion probability and risk degree is obtained after that. In addition, the model identify the high risk working procedure according to the activity critical index (ACI), what is more important is that the new method computing safe use rate of path float. The case study indicates that the method can provide more information about construction management to decision-makers and managers who can predominate project risk as a whole

Key concepts: Critical path method, Schedule, Float (project management), Computer science, Duration (music), Project management, Operations research, Path (computing)

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Risk Analysis for Construction Project Schedule Based on Flexible Network Simulation — Research Paper | ScholarLens