2012International Journal of Engineering Management and EconomicsRequires access

Load-dependent production planning for an assemble-to-order system

Tarik Aouam

Open publisher page 0 citations

Abstract

Assemble-to-order (ATO) systems enable manufacturing firms to be cost-effective and at the same time responsive to changing customer orders. In this paper, we study an assemble-to-order (ATO) system, where raw materials are released into a capacitated production stage. Inventory of produced components is kept in stock ready for final assembly once specific orders for products are received. An important planning issue is to find an optimal trade-off between capacity utilisation and components inventory holding cost with the aim to meet uncertain demand of end products. In this paper, we formulate two integrated production/inventory planning models using clearing functions while considering demand uncertainty. In the first model, we assume that demand is normally distributed and propose a chance constrained formulation. In the second model, we consider the case of unknown demand distributions and use a robust optimisation approach. The proposed models are linear programmes that provide safe production plans. We illustrate the proposed models using a real case study from the literature and analyse the effect of congestion and demand uncertainty.

About this research paper

What this paper is about

Assemble-to-order (ATO) systems enable manufacturing firms to be cost-effective and at the same time responsive to changing customer orders. In this paper, we study an assemble-to-order (ATO) system, where raw materials are released into a capacitated production stage. Inventory of produced components is kept in stock ready for final assembly once specific orders for products are received. An important planning issue is to find an optimal trade-off between capacity utilisation and components inventory holding cost with the aim to meet uncertain demand of end products. In this paper, we formulate two integrated production/inventory planning models using clearing functions while considering demand uncertainty. In the first model, we assume that demand is normally distributed and propose a chance constrained formulation. In the second model, we consider the case of unknown demand distributions and use a robust optimisation approach. The proposed models are linear programmes that provide safe production plans. We illustrate the proposed models using a real case study from the literature and analyse the effect of congestion and demand uncertainty.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Assemble-to-order (ATO) systems enable manufacturing firms to be cost-effective and at the same time responsive to changing customer orders. In this paper, we study an assemble-to-order (ATO) system, where raw materials are released into a capacitated production stage. Inventory of produced components is kept in stock ready for final assembly once specific orders for products are received. An important planning issue is to find an optimal trade-off between capacity utilisation and components inventory holding cost with the aim to meet uncertain demand of end products. In this paper, we formulate two integrated production/inventory planning models using clearing functions while considering demand uncertainty. In the first model, we assume that demand is normally distributed and propose a chance constrained formulation. In the second model, we consider the case of unknown demand distributions and use a robust optimisation approach. The proposed models are linear programmes that provide safe production plans. We illustrate the proposed models using a real case study from the literature and analyse the effect of congestion and demand uncertainty.

Key concepts: Safety stock, Production planning, Holding cost, Build to order, Order (exchange), Computer science, Production (economics), Clearing

Related papers

Back to paper searchBrowse research topicsOriginal source
Load-dependent production planning for an assemble-to-order system — Research Paper | ScholarLens