PERENCANAAN BIAYA PERSEDIAAN BAHAN BAKU PEMPEK DENGAN PENDEKATAN TEKNIK LOT SIZING DALAM MENDUKUNG SISTEM MATERIAL REQUIERMENT PLANNING (MRP)

Anys Hiqmah S Usmita, Eka Susanti, Ning Eliyati

Open publisher page 0 citations

Abstract

Pempek Sulthan Pindang Agan is one of the traditional food business of Palembang city that often faces problems related to the unstructured raw material inventory control system. The method used by the company is only based on previous experience without doing any forecasting or planning mathematically. The researcher will determine the result of forecasting the production demand and the total minimum inventory cost of lot sizing technique with total cost of actual inventory of company. Material Requierment Planning method using ARIMA forecasting method and two methods of lot sizing, consist of Lot For Lot (LFL) and Economic Order Quantity (EOQ) method. The total cost of raw material inventory control before using the MRP is Rp 2.935.736.350, while after using the MRP with lot sizing LFL technique is Rp 2.432.932.155 and with lot sizing EOQ technique is Rp 2.491.587.490. Thus, the results of the calculation by using two kinds of lot sizing methods show that LFL can make the lowest inventory cost. It means the company saves a fee of Rp 502.804.195. so the LFL method can be used to calculate the cost of raw material inventory of Pempek Sulthan Pindang Agan.

About this research paper

What this paper is about

Pempek Sulthan Pindang Agan is one of the traditional food business of Palembang city that often faces problems related to the unstructured raw material inventory control system. The method used by the company is only based on previous experience without doing any forecasting or planning mathematically. The researcher will determine the result of forecasting the production demand and the total minimum inventory cost of lot sizing technique with total cost of actual inventory of company. Material Requierment Planning method using ARIMA forecasting method and two methods of lot sizing, consist of Lot For Lot (LFL) and Economic Order Quantity (EOQ) method. The total cost of raw material inventory control before using the MRP is Rp 2.935.736.350, while after using the MRP with lot sizing LFL technique is Rp 2.432.932.155 and with lot sizing EOQ technique is Rp 2.491.587.490. Thus, the results of the calculation by using two kinds of lot sizing methods show that LFL can make the lowest inventory cost. It means the company saves a fee of Rp 502.804.195. so the LFL method can be used to calculate the cost of raw material inventory of Pempek Sulthan Pindang Agan.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Pempek Sulthan Pindang Agan is one of the traditional food business of Palembang city that often faces problems related to the unstructured raw material inventory control system. The method used by the company is only based on previous experience without doing any forecasting or planning mathematically. The researcher will determine the result of forecasting the production demand and the total minimum inventory cost of lot sizing technique with total cost of actual inventory of company. Material Requierment Planning method using ARIMA forecasting method and two methods of lot sizing, consist of Lot For Lot (LFL) and Economic Order Quantity (EOQ) method. The total cost of raw material inventory control before using the MRP is Rp 2.935.736.350, while after using the MRP with lot sizing LFL technique is Rp 2.432.932.155 and with lot sizing EOQ technique is Rp 2.491.587.490. Thus, the results of the calculation by using two kinds of lot sizing methods show that LFL can make the lowest inventory cost. It means the company saves a fee of Rp 502.804.195. so the LFL method can be used to calculate the cost of raw material inventory of Pempek Sulthan Pindang Agan.

Key concepts: Economic order quantity, Material requirements planning, Inventory control, Sizing, Inventory cost, Raw material, Total cost, Production planning