2006•IIE TransactionsRequires access

Detecting improvement using Shewhart attribute control charts when the lower control limit is zero

James M. Lucas, Darwin J. Davis, Erwin M. Saniga

Open publisher page 26 citations

Abstract

In this paper, we present a method to monitor count data so as to be able to detect improvement when the counts are low enough to cause the lower limit to be zero. The method, which is proposed as an add-on to the conventional Shewhart control chart, consists in counting the number of samples in which zero defectives or zero defects per unit occur and signaling an increase in quality if k-in-a-row or 2-in-t samples have zero counts of defectives or zero defects per unit. This method enjoys some similarities to the very popular Shewhart control chart in that it is easy to design, understand and use. It is flexible, robust, and, like the Shewhart chart, yields detection frequencies that are optimal for very large shifts and good for other shifts. Some comparisons with traditional CUSUM charts are provided. Figures enabling Shewhart control chart users to easily design low-side add-on control charts are given for c and np charts.

About this research paper

What this paper is about

In this paper, we present a method to monitor count data so as to be able to detect improvement when the counts are low enough to cause the lower limit to be zero. The method, which is proposed as an add-on to the conventional Shewhart control chart, consists in counting the number of samples in which zero defectives or zero defects per unit occur and signaling an increase in quality if k-in-a-row or 2-in-t samples have zero counts of defectives or zero defects per unit. This method enjoys some similarities to the very popular Shewhart control chart in that it is easy to design, understand and use. It is flexible, robust, and, like the Shewhart chart, yields detection frequencies that are optimal for very large shifts and good for other shifts. Some comparisons with traditional CUSUM charts are provided. Figures enabling Shewhart control chart users to easily design low-side add-on control charts are given for c and np charts.

Why it matters

OpenAlex reports 26 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In this paper, we present a method to monitor count data so as to be able to detect improvement when the counts are low enough to cause the lower limit to be zero. The method, which is proposed as an add-on to the conventional Shewhart control chart, consists in counting the number of samples in which zero defectives or zero defects per unit occur and signaling an increase in quality if k-in-a-row or 2-in-t samples have zero counts of defectives or zero defects per unit. This method enjoys some similarities to the very popular Shewhart control chart in that it is easy to design, understand and use. It is flexible, robust, and, like the Shewhart chart, yields detection frequencies that are optimal for very large shifts and good for other shifts. Some comparisons with traditional CUSUM charts are provided. Figures enabling Shewhart control chart users to easily design low-side add-on control charts are given for c and np charts.

Key concepts: CUSUM, Control chart, X-bar chart, Shewhart individuals control chart, Control limits, EWMA chart, \bar x and R chart, Zero (linguistics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Detecting improvement using Shewhart attribute control charts when the lower control limit is zero — Research Paper | ScholarLens