2000Journal of Quality TechnologyRequires access

Two Alternatives to the ShewhartXControl Chart

Morton Klein

Open publisher page 157 citations

Abstract

Average run length (ARL) values are calculated for two X̄ control chart schemes and compared with those of a standard Shewhart chart. Both control charts are based on runs rules and are easily implemented. An out-of-control condition for one of the charts is a run of two of two successive points beyond a special control limit. The other chart uses a run of two of three successive points beyond a different control limit. Both schemes are shown to have better, that is, lower, ARL values than the standard Shewhart chart for process average shifts as large as 2.6 standard deviations from the mean.

About this research paper

What this paper is about

Average run length (ARL) values are calculated for two X̄ control chart schemes and compared with those of a standard Shewhart chart. Both control charts are based on runs rules and are easily implemented. An out-of-control condition for one of the charts is a run of two of two successive points beyond a special control limit. The other chart uses a run of two of three successive points beyond a different control limit. Both schemes are shown to have better, that is, lower, ARL values than the standard Shewhart chart for process average shifts as large as 2.6 standard deviations from the mean.

Why it matters

OpenAlex reports 157 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Average run length (ARL) values are calculated for two X̄ control chart schemes and compared with those of a standard Shewhart chart. Both control charts are based on runs rules and are easily implemented. An out-of-control condition for one of the charts is a run of two of two successive points beyond a special control limit. The other chart uses a run of two of three successive points beyond a different control limit. Both schemes are shown to have better, that is, lower, ARL values than the standard Shewhart chart for process average shifts as large as 2.6 standard deviations from the mean.

Key concepts: X-bar chart, Control chart, Shewhart individuals control chart, Control limits, \bar x and R chart, Chart, EWMA chart, Statistics

Related papers

Back to paper searchBrowse research topicsOriginal source
Two Alternatives to the ShewhartXControl Chart — Research Paper | ScholarLens