Discussion of harmonic limits evaluation

Wang Cong-ze, Jang Ping, Yang Jia, Wei Li-ming

Open publisher page 0 citations

Abstract

The nominal voltage for gb provisions of 110 kv and below allowable value and utility grid harmonics test method, it is our country in the utility grid restrictions in the harmonic distortion and distinguish system harmonic responsibility basis. But this is standard for all the general standard utility grid, and the distribution system of intelligent building office building has its own characteristics in the concrete application of the standard, will be confronted with some difficulties. This paper analyses the commercial office building in intelligent building, the characteristics of distribution system, discuss the application methods, finally gb realize harmonic limits requirement analysis, and points out that the required conditions of harmonic limits distribution system standards need power supply concerted cooperation and efforts.

About this research paper

What this paper is about

The nominal voltage for gb provisions of 110 kv and below allowable value and utility grid harmonics test method, it is our country in the utility grid restrictions in the harmonic distortion and distinguish system harmonic responsibility basis. But this is standard for all the general standard utility grid, and the distribution system of intelligent building office building has its own characteristics in the concrete application of the standard, will be confronted with some difficulties. This paper analyses the commercial office building in intelligent building, the characteristics of distribution system, discuss the application methods, finally gb realize harmonic limits requirement analysis, and points out that the required conditions of harmonic limits distribution system standards need power supply concerted cooperation and efforts.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The nominal voltage for gb provisions of 110 kv and below allowable value and utility grid harmonics test method, it is our country in the utility grid restrictions in the harmonic distortion and distinguish system harmonic responsibility basis. But this is standard for all the general standard utility grid, and the distribution system of intelligent building office building has its own characteristics in the concrete application of the standard, will be confronted with some difficulties. This paper analyses the commercial office building in intelligent building, the characteristics of distribution system, discuss the application methods, finally gb realize harmonic limits requirement analysis, and points out that the required conditions of harmonic limits distribution system standards need power supply concerted cooperation and efforts.

Key concepts: Harmonics, Harmonic, Total harmonic distortion, Grid, Harmonic analysis, Computer science, Reliability engineering, Distortion (music)

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion of harmonic limits evaluation — Research Paper | ScholarLens