Underbalanced coiled tubing sidetrack successful
Jan Adam, Michael R. Berry
Abstract
Jan Adam, Michael R. Berry
Abstract
The technique of drilling through a completion string, underbalanced, with coiled tubing eliminated some of the problems encountered with overbalanced drilling in a group of offset wells. This project confirmed that performing drilling operations in live wells can be carried out safely and effectively. Dalen is a sour gas field in the eastern part of The Netherlands and produces from vertical fractures in the Zechstein carbonate reservoir. The proposal for Dalen 2 was to abandon the lower section of the original hole and subsequently sidetrack conventionally to the top of the reservoir, run and cement a 5-in. liner, complete the well with a 5-in. monobore completion, and install the christmas tree. This part of the operation would be performed with a workover hoist. Thereafter, a 3 3/4-in. hole would be drilled through the completion and into the reservoir, underbalanced with coiled tubing. The drilling proposal had to address a number of key issues: creating underbalanced conditions; handling sour gas production at surface; handling and treating drilling fluids at surface; removing drilled solids from the returned fluid system; and deploying a long coiled tubing drilling bottom hole assembly (BHA) into a live well. The paper discusses planning, legislative issues, well preparation,more » the drilling program, and lessons learned.« less
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The technique of drilling through a completion string, underbalanced, with coiled tubing eliminated some of the problems encountered with overbalanced drilling in a group of offset wells. This project confirmed that performing drilling operations in live wells can be carried out safely and effectively. Dalen is a sour gas field in the eastern part of The Netherlands and produces from vertical fractures in the Zechstein carbonate reservoir. The proposal for Dalen 2 was to abandon the lower section of the original hole and subsequently sidetrack conventionally to the top of the reservoir, run and cement a 5-in. liner, complete the well with a 5-in. monobore completion, and install the christmas tree. This part of the operation would be performed with a workover hoist. Thereafter, a 3 3/4-in. hole would be drilled through the completion and into the reservoir, underbalanced with coiled tubing. The drilling proposal had to address a number of key issues: creating underbalanced conditions; handling sour gas production at surface; handling and treating drilling fluids at surface; removing drilled solids from the returned fluid system; and deploying a long coiled tubing drilling bottom hole assembly (BHA) into a live well. The paper discusses planning, legislative issues, well preparation,more » the drilling program, and lessons learned.« less
Key concepts: Coiled tubing, Workover, Petroleum engineering, Underbalanced drilling, Completion (oil and gas wells), Drilling, Engineering, Well drilling