BP faces North Sea challenges
W.B. Bleakley
Abstract
W.B. Bleakley
Abstract
This paper examines British Petroleum's work on the following projects: Buchan field, with its faulted and fractured reservoir, is to have gas lift installed; Magnus field's platform, the tallest in the North Sea, is nearing completion, and development drilling is due to start; research on polymers to be used for enhanced recovery in older fields; and the Single Well Oil Production System (SWOPS) task group continues its development work to prepare for exploitation of small but well-defined oil accumulations. A diagram is presented of viscometer developed by BP scientists to operate over a long period of time under controlled temperature conditions. Design criteria for a suitable vessel to be used on a SWOPS facility include: ability to work in water depths from 250 to 650 ft; excursion from station under dynamic positioning limited to 6% of water depth; production-handling equipment; maximum gas production rate; equipment to handle 15% water cut by volume; and equipment rated for 5,000 psi pressure.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper examines British Petroleum's work on the following projects: Buchan field, with its faulted and fractured reservoir, is to have gas lift installed; Magnus field's platform, the tallest in the North Sea, is nearing completion, and development drilling is due to start; research on polymers to be used for enhanced recovery in older fields; and the Single Well Oil Production System (SWOPS) task group continues its development work to prepare for exploitation of small but well-defined oil accumulations. A diagram is presented of viscometer developed by BP scientists to operate over a long period of time under controlled temperature conditions. Design criteria for a suitable vessel to be used on a SWOPS facility include: ability to work in water depths from 250 to 650 ft; excursion from station under dynamic positioning limited to 6% of water depth; production-handling equipment; maximum gas production rate; equipment to handle 15% water cut by volume; and equipment rated for 5,000 psi pressure.
Key concepts: Petroleum engineering, Work (physics), Petroleum, Drilling, Oil production, Completion (oil and gas wells), Marine engineering, Lift (data mining)