1983OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Marathon solves Brae Field's problems

W.B. Bleakley

Open publisher page 0 citations

Abstract

When Marathon Oil starts production in the South Brae field (North Sea) this summer, it will have set the following milestones: (1) The 13,500-ft reservoir is the deepest developed in the North Sea to date, (2) the topside equipment is the heaviest placed on any North Sea steel jacket, (3) the produced gas contains a large amount of liquefiable hydrocarbons and 35% carbon dioxide (4) the platforms gas-sweetening module is the first ever installed offshore, (5) reservoir temperature (240/sup 0/F) is the highest of any North Sea reservoir developed so far, (6) the entire project is one of the few in the North Sea to be completed on schedule and within the budget proposed 3 years earlier, and (7) the deck modules were virtually 100% complete before being lifted onto the jacket. Some recently drilled wells in the area have found hydrocarbons outside the reach of the platform. One of these areas, designated North Brae, appears to hold a condensate reservoir that shows promise of becoming commercial. Marathon engineers feel a strong possibility that one or more additional platforms will be needed in the area.

About this research paper

What this paper is about

When Marathon Oil starts production in the South Brae field (North Sea) this summer, it will have set the following milestones: (1) The 13,500-ft reservoir is the deepest developed in the North Sea to date, (2) the topside equipment is the heaviest placed on any North Sea steel jacket, (3) the produced gas contains a large amount of liquefiable hydrocarbons and 35% carbon dioxide (4) the platforms gas-sweetening module is the first ever installed offshore, (5) reservoir temperature (240/sup 0/F) is the highest of any North Sea reservoir developed so far, (6) the entire project is one of the few in the North Sea to be completed on schedule and within the budget proposed 3 years earlier, and (7) the deck modules were virtually 100% complete before being lifted onto the jacket. Some recently drilled wells in the area have found hydrocarbons outside the reach of the platform. One of these areas, designated North Brae, appears to hold a condensate reservoir that shows promise of becoming commercial. Marathon engineers feel a strong possibility that one or more additional platforms will be needed in the area.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

When Marathon Oil starts production in the South Brae field (North Sea) this summer, it will have set the following milestones: (1) The 13,500-ft reservoir is the deepest developed in the North Sea to date, (2) the topside equipment is the heaviest placed on any North Sea steel jacket, (3) the produced gas contains a large amount of liquefiable hydrocarbons and 35% carbon dioxide (4) the platforms gas-sweetening module is the first ever installed offshore, (5) reservoir temperature (240/sup 0/F) is the highest of any North Sea reservoir developed so far, (6) the entire project is one of the few in the North Sea to be completed on schedule and within the budget proposed 3 years earlier, and (7) the deck modules were virtually 100% complete before being lifted onto the jacket. Some recently drilled wells in the area have found hydrocarbons outside the reach of the platform. One of these areas, designated North Brae, appears to hold a condensate reservoir that shows promise of becoming commercial. Marathon engineers feel a strong possibility that one or more additional platforms will be needed in the area.

Key concepts: North sea, Submarine pipeline, Deck, Natural gas field, Schedule, Petroleum, Geology, Petroleum engineering