Texaco miscible-flood program begins for Alberta pool soon
W.B. Bleakley
Abstract
W.B. Bleakley
Abstract
Solvent flooding of the Wizard Lake D-3A pool in Alberta, Canada, will get under way near the first of 1970. Solvent, gas, and water-injection systems are due for almost simultaneous start-up as Texaco Exploration Co. tries for an ultimate recovery of 323 million stock-tank barrel (stb) of oil. Recovery factor for the entire project is given as 84% by Alberta's Oil and Gas Conservation Board. Texaco's application to the board claimed an ultimate recovery of 89%. The flood, which is expected to behave miscibly, will operate vertically in the reservoir, much like Imperial Oil Ltd.'s Golden Spike project. A unique feature of the Wizard Lake project is the need to stabilize the oil-water contact. Hence, the water injection along with gas and solvent. The reservoir is a bioherm Devonian reef reaching a height of about 650 ft above the Cooking Lake member. Primary recovery mechanism is a combination expansion drive, water drive, and gravity drainage. Reservoir limits are established by a total of 68 wells, most of them on 40-acre spacing. Water, gas, and solvent will be injected into 2 wells each, starting about the first of 1970, or sooner. Four additional wells have been approved for solvent injection atmore » a later date, after another hearing.« less
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Solvent flooding of the Wizard Lake D-3A pool in Alberta, Canada, will get under way near the first of 1970. Solvent, gas, and water-injection systems are due for almost simultaneous start-up as Texaco Exploration Co. tries for an ultimate recovery of 323 million stock-tank barrel (stb) of oil. Recovery factor for the entire project is given as 84% by Alberta's Oil and Gas Conservation Board. Texaco's application to the board claimed an ultimate recovery of 89%. The flood, which is expected to behave miscibly, will operate vertically in the reservoir, much like Imperial Oil Ltd.'s Golden Spike project. A unique feature of the Wizard Lake project is the need to stabilize the oil-water contact. Hence, the water injection along with gas and solvent. The reservoir is a bioherm Devonian reef reaching a height of about 650 ft above the Cooking Lake member. Primary recovery mechanism is a combination expansion drive, water drive, and gravity drainage. Reservoir limits are established by a total of 68 wells, most of them on 40-acre spacing. Water, gas, and solvent will be injected into 2 wells each, starting about the first of 1970, or sooner. Four additional wells have been approved for solvent injection atmore » a later date, after another hearing.« less
Key concepts: Petroleum engineering, Separator (oil production), Petroleum, Acre, Geology, Well stimulation, Energy source, Environmental science