2013•Railway gazette internationalRequires access

ETCS or CBTC on cross-city links?

Ian M. Mitchell

Open publisher page 0 citations

Abstract

The Institute of Railway Signal Engineers (IRSE)'s International Technical Committee has been examining the choice between metro and main line train control technologies, as it is one that promoters and operations of cross-city rail links must make. Factors influencing current projects, such as the operating pattern and the interaction with other train services, play an important role in the decision making. This article takes a look at projects in London (London Thameslink and London Crossrail), Madrid (Madrid suburban), Istanbul (Istanbul Marmaray), and Paris (Paris RER Line E) to see what they have chosen - either European Train Control System (ECTS) or Communications Based Train Control (CBTC).

About this research paper

What this paper is about

The Institute of Railway Signal Engineers (IRSE)'s International Technical Committee has been examining the choice between metro and main line train control technologies, as it is one that promoters and operations of cross-city rail links must make. Factors influencing current projects, such as the operating pattern and the interaction with other train services, play an important role in the decision making. This article takes a look at projects in London (London Thameslink and London Crossrail), Madrid (Madrid suburban), Istanbul (Istanbul Marmaray), and Paris (Paris RER Line E) to see what they have chosen - either European Train Control System (ECTS) or Communications Based Train Control (CBTC).

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Institute of Railway Signal Engineers (IRSE)'s International Technical Committee has been examining the choice between metro and main line train control technologies, as it is one that promoters and operations of cross-city rail links must make. Factors influencing current projects, such as the operating pattern and the interaction with other train services, play an important role in the decision making. This article takes a look at projects in London (London Thameslink and London Crossrail), Madrid (Madrid suburban), Istanbul (Istanbul Marmaray), and Paris (Paris RER Line E) to see what they have chosen - either European Train Control System (ECTS) or Communications Based Train Control (CBTC).

Key concepts: Automatic train control, Transport engineering, Control (management), Telecommunications, Engineering, Line (geometry), Railway line, Railway system

Related papers

Back to paper searchBrowse research topicsOriginal source
ETCS or CBTC on cross-city links? — Research Paper | ScholarLens