Offshore pipeline design. Part 2. Critical laying operation calls for complete analysis

M.P.W. van Leerdam

Open publisher page 0 citations

Abstract

Installation of submarine pipelines requires the same design skills required to select pipe size and wall thickness, advises Shell International Petroleum Maatschappij B.V. Dynamic effects of tension and currents between the lay barge must be fully understood and adequately matched with the proper steel requirements. Graphics prove to be very helpful in determining tension requirements and sag-curvature capabilities in early planning of offshore pipelines.

About this research paper

What this paper is about

Installation of submarine pipelines requires the same design skills required to select pipe size and wall thickness, advises Shell International Petroleum Maatschappij B.V. Dynamic effects of tension and currents between the lay barge must be fully understood and adequately matched with the proper steel requirements. Graphics prove to be very helpful in determining tension requirements and sag-curvature capabilities in early planning of offshore pipelines.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Installation of submarine pipelines requires the same design skills required to select pipe size and wall thickness, advises Shell International Petroleum Maatschappij B.V. Dynamic effects of tension and currents between the lay barge must be fully understood and adequately matched with the proper steel requirements. Graphics prove to be very helpful in determining tension requirements and sag-curvature capabilities in early planning of offshore pipelines.

Key concepts: BARGE, Submarine pipeline, Pipeline transport, Pipeline (software), Marine engineering, Laying, Tension (geology), Submarine