1995American Water Works AssociationRequires access

Computer‐generated optimal pumping schedule

Elaine C. Sadowski, Vilas Nitivattananon, Rafeal G. Quimpo

Open publisher page 3 citations

Abstract

If the demand forecast is accurate, a computerized pumping schedule can save a utility money by responding quickly to shifts in demand. In Pittsburgh, Pa., electricity costs are governed by a complicated tariff. A study of the city's water distribution system was carried out to determine whether pumping costs could be reduced through computer scheduling of pump operation. Analysis focused on a subsystem that includes six pumping stations and six reservoirs. Quadratic relationships between pumping rate and energy cost were used to determine the sequence and duration of pump operation. The software generates an hourly pumping schedule at each station. The program was run on the subsystem using historical demand and actual 1989 electricity bills. The comparison indicated the optimal solution could have saved 15 percent in energy costs. The computerized optimization package is being tested at one pumping station.

About this research paper

What this paper is about

If the demand forecast is accurate, a computerized pumping schedule can save a utility money by responding quickly to shifts in demand. In Pittsburgh, Pa., electricity costs are governed by a complicated tariff. A study of the city's water distribution system was carried out to determine whether pumping costs could be reduced through computer scheduling of pump operation. Analysis focused on a subsystem that includes six pumping stations and six reservoirs. Quadratic relationships between pumping rate and energy cost were used to determine the sequence and duration of pump operation. The software generates an hourly pumping schedule at each station. The program was run on the subsystem using historical demand and actual 1989 electricity bills. The comparison indicated the optimal solution could have saved 15 percent in energy costs. The computerized optimization package is being tested at one pumping station.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

If the demand forecast is accurate, a computerized pumping schedule can save a utility money by responding quickly to shifts in demand. In Pittsburgh, Pa., electricity costs are governed by a complicated tariff. A study of the city's water distribution system was carried out to determine whether pumping costs could be reduced through computer scheduling of pump operation. Analysis focused on a subsystem that includes six pumping stations and six reservoirs. Quadratic relationships between pumping rate and energy cost were used to determine the sequence and duration of pump operation. The software generates an hourly pumping schedule at each station. The program was run on the subsystem using historical demand and actual 1989 electricity bills. The comparison indicated the optimal solution could have saved 15 percent in energy costs. The computerized optimization package is being tested at one pumping station.

Key concepts: Schedule, Electricity, Scheduling (production processes), Computer science, Software, Tariff, Water pumping, Operations research