2009DSpace@MIT (Massachusetts Institute of Technology)Open access

Production and inventory control of a multi-item multi-stage manufacturing system : simulation modeling, capacitated shipment planning and Kanban design

Syed Zia Abbas Rizvi

Open full text 0 citations

Abstract

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.

Open-access reader

About this research paper

What this paper is about

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.

Key concepts: Kanban, Production planning, Manufacturing engineering, Inventory control, Control (management), Operations management, Production (economics), Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Production and inventory control of a multi-item multi-stage manufacturing system : simulation modeling, capacitated shipment planning and Kanban design — Research Paper | ScholarLens