1996•Unpublished venueOpen access

Fermilab collider run 1b accelerator performance

Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States), V Bharadwaj, USDOE, Washington, DC (United States), Mike Halling, P Lucas, E. McCrory, S Mishra, S. Pruss, Steven Werkema

Open full text 3 citations

Abstract

This report summarizes the performance of Run 1b as of the end of July 1995. This run is the conclusion of Fermilab Collider Run 1, which consists of Run 1a (May 1992 - May 1993) and Run 1b (January 1994 - February 1996). Run 1b is characterized by being the first with the new 400 MeV Linac. At this time the run is not complete. Colliding beam physics is scheduled to resume after the summer 1995 shut down and continue until mid-February 1996. All of the operation to date is at a Tevatron energy of 900 GeV. This report emphasizes performance numbers and the various improvements made to systems to achieve this performance. It will only discuss the underlying physics to a limited extent. The report is divided into sections on: run statistics, I&C issues, proton source performance, antiproton source performance, main ring performance, Tevatron performance, and a summary.

Open-access reader

About this research paper

What this paper is about

This report summarizes the performance of Run 1b as of the end of July 1995. This run is the conclusion of Fermilab Collider Run 1, which consists of Run 1a (May 1992 - May 1993) and Run 1b (January 1994 - February 1996). Run 1b is characterized by being the first with the new 400 MeV Linac. At this time the run is not complete. Colliding beam physics is scheduled to resume after the summer 1995 shut down and continue until mid-February 1996. All of the operation to date is at a Tevatron energy of 900 GeV. This report emphasizes performance numbers and the various improvements made to systems to achieve this performance. It will only discuss the underlying physics to a limited extent. The report is divided into sections on: run statistics, I&C issues, proton source performance, antiproton source performance, main ring performance, Tevatron performance, and a summary.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This report summarizes the performance of Run 1b as of the end of July 1995. This run is the conclusion of Fermilab Collider Run 1, which consists of Run 1a (May 1992 - May 1993) and Run 1b (January 1994 - February 1996). Run 1b is characterized by being the first with the new 400 MeV Linac. At this time the run is not complete. Colliding beam physics is scheduled to resume after the summer 1995 shut down and continue until mid-February 1996. All of the operation to date is at a Tevatron energy of 900 GeV. This report emphasizes performance numbers and the various improvements made to systems to achieve this performance. It will only discuss the underlying physics to a limited extent. The report is divided into sections on: run statistics, I&C issues, proton source performance, antiproton source performance, main ring performance, Tevatron performance, and a summary.

Key concepts: Tevatron, Fermilab, Collider, Antiproton, Physics, Particle accelerator, Shut down, Nuclear physics