VALUE ENGINEERING IN CONSTRUCTION

Alphonse J. Dell'Isola

Open publisher page 7 citations

Abstract

VALUE ENGINEERING IS BASICALLY AN ORGANIZED APPROACH TO GET MORE FOR EVERY DOLLAR SPENT. AS OUTLINED IN THE ARMED SERVICES PROCUREMENT REGULATION, IT IS CONCERNED WITH THE ELIMINATION OR MODIFICATION OF ANYTHING THAT ADDS COST TO A PRODUCT BUT IS NOT NECESSARY TO ITS BASIC FUNCTION - THAT IS, PERFORMANCE, SAFETY, APPEARANCE, OR MAINTENANCE. THE OBJECTIVE OF VALUE ENGINEERING IS TO LOWER THE COST OF AN ITEM WITHOUT ADVERSELY AFFECTING PERFORMANCE. VALUE ENGINEERING WAS INITIALLY DEVELOPED DURING WORLD WAR II, WHEN MATERIALS WERE DIFFICULT TO OBTAIN AND THE RESULTING SHORTAGES FORCED THE INTRODUCTION OF MANY SUBSTITUTES. THE FACILITIES ENGINEERING COMMAND HAS A FULL-TIME STAFF ASSIGNED TO REVIEW DESIGNS IN ORDER TO FIND WAYS OF CUTTING TIME AND COST. CONTRACTORS ON FIXED-PRICE WORK ARE INVITED TO PROPOSE CHANGES IN PLANS THAT WILL RESULT IN ECONOMIES, AND THE CONTRACTORS REALIZES HALF THE SAVING ON ANY IDEAS THAT ARE ACCEPTED. INITIAL RESULTS IN THE APPLICATION OF VALUE ENGINEERING TECHNIQUES IN THE CONSTRUCTION INDUSTRY HAVE INDICATED THAT A SIGNIFICANT POTENTIAL DOES EXIST. THE DEGREE OF SUCCESS OF THIS CONCEPT IN THE CONSTRUCTION INDUSTRY DEPENDS UPON THE ACCEPTANCE AND ACTIVE SUPPORT OF BOTH THE ENGINEERS AND THE CONTRACTORS.

About this research paper

What this paper is about

VALUE ENGINEERING IS BASICALLY AN ORGANIZED APPROACH TO GET MORE FOR EVERY DOLLAR SPENT. AS OUTLINED IN THE ARMED SERVICES PROCUREMENT REGULATION, IT IS CONCERNED WITH THE ELIMINATION OR MODIFICATION OF ANYTHING THAT ADDS COST TO A PRODUCT BUT IS NOT NECESSARY TO ITS BASIC FUNCTION - THAT IS, PERFORMANCE, SAFETY, APPEARANCE, OR MAINTENANCE. THE OBJECTIVE OF VALUE ENGINEERING IS TO LOWER THE COST OF AN ITEM WITHOUT ADVERSELY AFFECTING PERFORMANCE. VALUE ENGINEERING WAS INITIALLY DEVELOPED DURING WORLD WAR II, WHEN MATERIALS WERE DIFFICULT TO OBTAIN AND THE RESULTING SHORTAGES FORCED THE INTRODUCTION OF MANY SUBSTITUTES. THE FACILITIES ENGINEERING COMMAND HAS A FULL-TIME STAFF ASSIGNED TO REVIEW DESIGNS IN ORDER TO FIND WAYS OF CUTTING TIME AND COST. CONTRACTORS ON FIXED-PRICE WORK ARE INVITED TO PROPOSE CHANGES IN PLANS THAT WILL RESULT IN ECONOMIES, AND THE CONTRACTORS REALIZES HALF THE SAVING ON ANY IDEAS THAT ARE ACCEPTED. INITIAL RESULTS IN THE APPLICATION OF VALUE ENGINEERING TECHNIQUES IN THE CONSTRUCTION INDUSTRY HAVE INDICATED THAT A SIGNIFICANT POTENTIAL DOES EXIST. THE DEGREE OF SUCCESS OF THIS CONCEPT IN THE CONSTRUCTION INDUSTRY DEPENDS UPON THE ACCEPTANCE AND ACTIVE SUPPORT OF BOTH THE ENGINEERS AND THE CONTRACTORS.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

VALUE ENGINEERING IS BASICALLY AN ORGANIZED APPROACH TO GET MORE FOR EVERY DOLLAR SPENT. AS OUTLINED IN THE ARMED SERVICES PROCUREMENT REGULATION, IT IS CONCERNED WITH THE ELIMINATION OR MODIFICATION OF ANYTHING THAT ADDS COST TO A PRODUCT BUT IS NOT NECESSARY TO ITS BASIC FUNCTION - THAT IS, PERFORMANCE, SAFETY, APPEARANCE, OR MAINTENANCE. THE OBJECTIVE OF VALUE ENGINEERING IS TO LOWER THE COST OF AN ITEM WITHOUT ADVERSELY AFFECTING PERFORMANCE. VALUE ENGINEERING WAS INITIALLY DEVELOPED DURING WORLD WAR II, WHEN MATERIALS WERE DIFFICULT TO OBTAIN AND THE RESULTING SHORTAGES FORCED THE INTRODUCTION OF MANY SUBSTITUTES. THE FACILITIES ENGINEERING COMMAND HAS A FULL-TIME STAFF ASSIGNED TO REVIEW DESIGNS IN ORDER TO FIND WAYS OF CUTTING TIME AND COST. CONTRACTORS ON FIXED-PRICE WORK ARE INVITED TO PROPOSE CHANGES IN PLANS THAT WILL RESULT IN ECONOMIES, AND THE CONTRACTORS REALIZES HALF THE SAVING ON ANY IDEAS THAT ARE ACCEPTED. INITIAL RESULTS IN THE APPLICATION OF VALUE ENGINEERING TECHNIQUES IN THE CONSTRUCTION INDUSTRY HAVE INDICATED THAT A SIGNIFICANT POTENTIAL DOES EXIST. THE DEGREE OF SUCCESS OF THIS CONCEPT IN THE CONSTRUCTION INDUSTRY DEPENDS UPON THE ACCEPTANCE AND ACTIVE SUPPORT OF BOTH THE ENGINEERS AND THE CONTRACTORS.

Key concepts: Value engineering, Procurement, Value (mathematics), Order (exchange), Economic shortage, Function (biology), Liberian dollar, Product (mathematics)