Micro Hydro Penstock Design

Andreas von Flotow

Open publisher page 1 citations

Abstract

Quantitative analysis of re-routing a high-head, low-flow, run-of-the-river, under-100 kW hydroelectric power plant penstock and comparison with the original route for purposes of head loss estimation and available hydraulic power prediction

About this research paper

What this paper is about

Quantitative analysis of re-routing a high-head, low-flow, run-of-the-river, under-100 kW hydroelectric power plant penstock and comparison with the original route for purposes of head loss estimation and available hydraulic power prediction

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Quantitative analysis of re-routing a high-head, low-flow, run-of-the-river, under-100 kW hydroelectric power plant penstock and comparison with the original route for purposes of head loss estimation and available hydraulic power prediction

Key concepts: Penstock, Hydroelectricity, Head (geology), Hydraulic head, Hydro power, Marine engineering, Electrical conduit, Power station

Related papers

Back to paper searchBrowse research topicsOriginal source
Micro Hydro Penstock Design — Research Paper | ScholarLens