2012Unpublished venueRequires access

Micro Hydroelectric Penstock Design Analysis

Andreas von Flotow

Open publisher page 0 citations

Abstract

Quantitative analysis of re-routing a high-head, low-flow, run-of-the-river, under-100 kW hydro electric power plant penstock and comparison with the original route for purposes of head loss estimation and available power prediction.

About this research paper

What this paper is about

Quantitative analysis of re-routing a high-head, low-flow, run-of-the-river, under-100 kW hydro electric power plant penstock and comparison with the original route for purposes of head loss estimation and available power prediction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Quantitative analysis of re-routing a high-head, low-flow, run-of-the-river, under-100 kW hydro electric power plant penstock and comparison with the original route for purposes of head loss estimation and available power prediction.

Key concepts: Penstock, Hydroelectricity, Head (geology), Hydraulic head, Electrical conduit, Power station, Marine engineering, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Micro Hydroelectric Penstock Design Analysis — Research Paper | ScholarLens