1985•Proc., Annu. Meet., Air Pollut. Control Assoc.; (United States)Requires access

Cofiring of refuse derived fuel and coal at the C. P. Crane Power Plant

N.G. Jr. Lassahn

Open publisher page 0 citations

Abstract

Baltimore Gas and Electric has been cooperating with State and local authorities to develop a viable solution to some of the regional waste disposal problems. One of these programs has resulted in a long term test to cofire RDF and coal at an existing BG and E power plant. Although others have tried this in the past with mixed success, it is felt that the program in Baltimore will be successful due to the unique combination of the close proximity of a coal fired cyclone boiler with newly installed dust collection devices and a modern, efficient RDF processing facility. The first year of the long term firing program has identified a few potential problems, but has also shown that RDF can be successfully burned in this boiler and result in a savings in fuel costs to BG and E customers. At the same time, Baltimore County is obtaining a disposal outlet for its municipal solid waste with revenue producing potential.

About this research paper

What this paper is about

Baltimore Gas and Electric has been cooperating with State and local authorities to develop a viable solution to some of the regional waste disposal problems. One of these programs has resulted in a long term test to cofire RDF and coal at an existing BG and E power plant. Although others have tried this in the past with mixed success, it is felt that the program in Baltimore will be successful due to the unique combination of the close proximity of a coal fired cyclone boiler with newly installed dust collection devices and a modern, efficient RDF processing facility. The first year of the long term firing program has identified a few potential problems, but has also shown that RDF can be successfully burned in this boiler and result in a savings in fuel costs to BG and E customers. At the same time, Baltimore County is obtaining a disposal outlet for its municipal solid waste with revenue producing potential.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Baltimore Gas and Electric has been cooperating with State and local authorities to develop a viable solution to some of the regional waste disposal problems. One of these programs has resulted in a long term test to cofire RDF and coal at an existing BG and E power plant. Although others have tried this in the past with mixed success, it is felt that the program in Baltimore will be successful due to the unique combination of the close proximity of a coal fired cyclone boiler with newly installed dust collection devices and a modern, efficient RDF processing facility. The first year of the long term firing program has identified a few potential problems, but has also shown that RDF can be successfully burned in this boiler and result in a savings in fuel costs to BG and E customers. At the same time, Baltimore County is obtaining a disposal outlet for its municipal solid waste with revenue producing potential.

Key concepts: Cofiring, Waste management, Refuse-derived fuel, Boiler (water heating), Coal, Power station, Engineering, Revenue