1985•OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Deepwater production platforms

S.S. Pagano

Open publisher page 0 citations

Abstract

At least eight deepwater production platforms are currently being designed or planned by major US oil companies for future installation in the Gulf of Mexico offshore Texas and Louisiana. These platforms mostly will be conventional fixed steel platforms pinned to the seafloor in water depths ranging from 150 to 550 meters. At least one tension-leg production platform (TLP) is planned by Conoco for installation in 550-meter waters off Louisiana. The first platform in this a round of deepwater activity was ordered by Shell Offshore. The platform will be a large structure for installation in Green Canyon Block 63 in 230-meter waters. This project has been dubbed Boxer. The next big deepwater platform order to be let will be another structure for Shell Offshore for installation in 1987 in 410-meter waters in Green Canyon Block 65 in the Gulf of Mexico. Dubbed the Bullwinkle project, this will be the largest platform installed to date in the world. Studies now are being conducted on whether the Bullwinkle jacket will be a single piece or two-piece structure. Two Texas fabrication yards have been shortlisted to build this structure. These and other drilling platforms are described.

About this research paper

What this paper is about

At least eight deepwater production platforms are currently being designed or planned by major US oil companies for future installation in the Gulf of Mexico offshore Texas and Louisiana. These platforms mostly will be conventional fixed steel platforms pinned to the seafloor in water depths ranging from 150 to 550 meters. At least one tension-leg production platform (TLP) is planned by Conoco for installation in 550-meter waters off Louisiana. The first platform in this a round of deepwater activity was ordered by Shell Offshore. The platform will be a large structure for installation in Green Canyon Block 63 in 230-meter waters. This project has been dubbed Boxer. The next big deepwater platform order to be let will be another structure for Shell Offshore for installation in 1987 in 410-meter waters in Green Canyon Block 65 in the Gulf of Mexico. Dubbed the Bullwinkle project, this will be the largest platform installed to date in the world. Studies now are being conducted on whether the Bullwinkle jacket will be a single piece or two-piece structure. Two Texas fabrication yards have been shortlisted to build this structure. These and other drilling platforms are described.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

At least eight deepwater production platforms are currently being designed or planned by major US oil companies for future installation in the Gulf of Mexico offshore Texas and Louisiana. These platforms mostly will be conventional fixed steel platforms pinned to the seafloor in water depths ranging from 150 to 550 meters. At least one tension-leg production platform (TLP) is planned by Conoco for installation in 550-meter waters off Louisiana. The first platform in this a round of deepwater activity was ordered by Shell Offshore. The platform will be a large structure for installation in Green Canyon Block 63 in 230-meter waters. This project has been dubbed Boxer. The next big deepwater platform order to be let will be another structure for Shell Offshore for installation in 1987 in 410-meter waters in Green Canyon Block 65 in the Gulf of Mexico. Dubbed the Bullwinkle project, this will be the largest platform installed to date in the world. Studies now are being conducted on whether the Bullwinkle jacket will be a single piece or two-piece structure. Two Texas fabrication yards have been shortlisted to build this structure. These and other drilling platforms are described.

Key concepts: Submarine pipeline, Canyon, Marine engineering, Engineering, Drilling, Geology, Oceanography, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Deepwater production platforms — Research Paper | ScholarLens