Beam dynamics studies on BEPCII storage rings at the commissioning stage
秦庆, 黄楠, 刘渭滨, 刘瑜冬, 彭月梅, 邱静, Dou Wang, 王昕昊, 娜 王, Jiuqing Wang, 魏源源, 温雪梅, 邢军, Gang Xu, 于程辉, 张闯, 张源, 赵政, 周德民
Abstract
秦庆, 黄楠, 刘渭滨, 刘瑜冬, 彭月梅, 邱静, Dou Wang, 王昕昊, 娜 王, Jiuqing Wang, 魏源源, 温雪梅, 邢军, Gang Xu, 于程辉, 张闯, 张源, 赵政, 周德民
Abstract
During the 1st and 2nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 ...
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
During the 1st and 2nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 ...
Key concepts: Upgrade, Collider, Luminosity, Synchrotron radiation, Physics, Beam (structure), Project commissioning, Nuclear physics