Analysis of Rainfall Runoff Reduction Effect Depending upon the Location of Detention Pond in Urban Area
Jae‐Joon Lee, Ho Nyun Kim
Abstract
Jae‐Joon Lee, Ho Nyun Kim
Abstract
Urbanization results in increased runoff volume and flowrate and shortening in time of concentration, which may cause frequent flooding downstream. The retardation structures are used to eliminate adverse downstream effects of urban stormwater runoff. There are various types of flow retardation measures include detention basin, retention basin, and infiltration basin. In this study, to present a rough standard about location of detention pond for attenuating peak flow of urban area, the runoff reduction effect is analyzed at outlet point when detention pond is located to upstream drainage than outlet. The runoff reduction effects are analyzed under the three assumed basins. These basins have longitudinal shape (SF = 0. 204), concentration shape (SF = 0. 782), and middle shape (SF = 0.567). Numerous variables in connection with the storage effect of detention pond and the runoff reduction effects are analyzed by changing the location of detention pond. To analyze runoff reduction effect by location of single detention pond, Dimensionless Upstream Area Ratio (DUAR) is changed to 20%, 40%, 60%, and 80% according to the basin shape. In case of multiple detention pond, DUAR is changed to 60%, 80%, 100%, 120%, and 140% only under the middle shape basin (SF = 0.567). Related figures and regression equations to determine the location of detention pond are obtained from above analysis of two cases in this study. These results can be used to determine the location of appropriate detention pond corresponding to the any runoff reduction such as storage ratio and peak flow ratio in urban watershed.
OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Urbanization results in increased runoff volume and flowrate and shortening in time of concentration, which may cause frequent flooding downstream. The retardation structures are used to eliminate adverse downstream effects of urban stormwater runoff. There are various types of flow retardation measures include detention basin, retention basin, and infiltration basin. In this study, to present a rough standard about location of detention pond for attenuating peak flow of urban area, the runoff reduction effect is analyzed at outlet point when detention pond is located to upstream drainage than outlet. The runoff reduction effects are analyzed under the three assumed basins. These basins have longitudinal shape (SF = 0. 204), concentration shape (SF = 0. 782), and middle shape (SF = 0.567). Numerous variables in connection with the storage effect of detention pond and the runoff reduction effects are analyzed by changing the location of detention pond. To analyze runoff reduction effect by location of single detention pond, Dimensionless Upstream Area Ratio (DUAR) is changed to 20%, 40%, 60%, and 80% according to the basin shape. In case of multiple detention pond, DUAR is changed to 60%, 80%, 100%, 120%, and 140% only under the middle shape basin (SF = 0.567). Related figures and regression equations to determine the location of detention pond are obtained from above analysis of two cases in this study. These results can be used to determine the location of appropriate detention pond corresponding to the any runoff reduction such as storage ratio and peak flow ratio in urban watershed.
Key concepts: Surface runoff, Detention basin, Hydrology (agriculture), Environmental science, Drainage basin, Watershed, Structural basin, Stormwater