CAUSES OF LEAKAGE IN HRE FLANGES
David E. Taylor, John Maloney
Abstract
Open-access reader
David E. Taylor, John Maloney
Abstract
Open-access reader
per day per inch of gasket pitch diameter could be routinely- attained. Undamaged gaskets could be reinstalled or new gaskets used with equal probability of achieving acceptable leak rates. The system installed in HRE-2 was provided with a high-pressure buffer system to ensure that the small amount of leakage to the cell would be nonradioactive. (auth)
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
per day per inch of gasket pitch diameter could be routinely- attained. Undamaged gaskets could be reinstalled or new gaskets used with equal probability of achieving acceptable leak rates. The system installed in HRE-2 was provided with a high-pressure buffer system to ensure that the small amount of leakage to the cell would be nonradioactive. (auth)
Key concepts: Gasket, Leakage (economics), Leak, Materials science, Composite material, Forensic engineering, Environmental science, Engineering