2003Unpublished venueRequires access

Bridge Life-cycle Cost Analysis

Hugh Hawk

Open publisher page 92 citations

Abstract

The two primary obstacles for applying bridge life-cycle cost analysis (BLCCA) have been the lack of a uniformly accepted methodology and the lack of access to reliable cost and service life personnel. There is also an apparent conflict with the least-first-cost method of contract administration. The lack of a rational approach to the consideration of important factors such as obsolescence, bridge vulnerability to extreme events, and the uncertainty in the cost and timing of repairs has also hindered the use of life-cycle costing in the past. This report and the BLCCA methodology developed as part of NCHRP Project 12-43 provide a framework for carrying out BLCCA and explicitly consider obsolescence, bridge vulnerability, and uncertainty. Cost parameters are included with recommended default values. The methodology provides the flexibility to add additional cost parameters identified in future research. This methodology is augmented by a BLCCA software package (with User's Manual), which automates the analysis process, and by a Guidance Manual, which describes the BLCCA process.

About this research paper

What this paper is about

The two primary obstacles for applying bridge life-cycle cost analysis (BLCCA) have been the lack of a uniformly accepted methodology and the lack of access to reliable cost and service life personnel. There is also an apparent conflict with the least-first-cost method of contract administration. The lack of a rational approach to the consideration of important factors such as obsolescence, bridge vulnerability to extreme events, and the uncertainty in the cost and timing of repairs has also hindered the use of life-cycle costing in the past. This report and the BLCCA methodology developed as part of NCHRP Project 12-43 provide a framework for carrying out BLCCA and explicitly consider obsolescence, bridge vulnerability, and uncertainty. Cost parameters are included with recommended default values. The methodology provides the flexibility to add additional cost parameters identified in future research. This methodology is augmented by a BLCCA software package (with User's Manual), which automates the analysis process, and by a Guidance Manual, which describes the BLCCA process.

Why it matters

OpenAlex reports 92 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The two primary obstacles for applying bridge life-cycle cost analysis (BLCCA) have been the lack of a uniformly accepted methodology and the lack of access to reliable cost and service life personnel. There is also an apparent conflict with the least-first-cost method of contract administration. The lack of a rational approach to the consideration of important factors such as obsolescence, bridge vulnerability to extreme events, and the uncertainty in the cost and timing of repairs has also hindered the use of life-cycle costing in the past. This report and the BLCCA methodology developed as part of NCHRP Project 12-43 provide a framework for carrying out BLCCA and explicitly consider obsolescence, bridge vulnerability, and uncertainty. Cost parameters are included with recommended default values. The methodology provides the flexibility to add additional cost parameters identified in future research. This methodology is augmented by a BLCCA software package (with User's Manual), which automates the analysis process, and by a Guidance Manual, which describes the BLCCA process.

Key concepts: Obsolescence, Bridge (graph theory), Flexibility (engineering), Activity-based costing, Process (computing), Risk analysis (engineering), Reliability engineering, Engineering