PG and E planning 2000 MW combined cycle by 1981. [Pacific Gas and Electric Company (PG and E)]

Ilia Stambler

Open publisher page 0 citations

Abstract

By 1980 to 1981, California's Pacific Gas and Electric Co is planning addition and commissioning of some 2000 MW of combined cycle plant, bumping their installed gas turbine capacity up from present 200 MW of simple cycle machine. There are plans to install two plants at two different sites, which haven't been confirmed yet, pending review by regulatory commissions. PG and E is looking for 400 MW combined output with roughly 75 percent of the capacity gas turbine, for siting in the San Francisco Bay area, probably at the existing Potrero generating station. Plant cost is figured at around $350 per KW installed, burning No. 2 diesel oil at a cost of $2.50 per million Btu. Operating expenses of 1.13 cents per kW fixed costs, and 4.88 cents variable costs for total of 6.01 cents per kWh are predicted.

About this research paper

What this paper is about

By 1980 to 1981, California's Pacific Gas and Electric Co is planning addition and commissioning of some 2000 MW of combined cycle plant, bumping their installed gas turbine capacity up from present 200 MW of simple cycle machine. There are plans to install two plants at two different sites, which haven't been confirmed yet, pending review by regulatory commissions. PG and E is looking for 400 MW combined output with roughly 75 percent of the capacity gas turbine, for siting in the San Francisco Bay area, probably at the existing Potrero generating station. Plant cost is figured at around $350 per KW installed, burning No. 2 diesel oil at a cost of $2.50 per million Btu. Operating expenses of 1.13 cents per kW fixed costs, and 4.88 cents variable costs for total of 6.01 cents per kWh are predicted.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

By 1980 to 1981, California's Pacific Gas and Electric Co is planning addition and commissioning of some 2000 MW of combined cycle plant, bumping their installed gas turbine capacity up from present 200 MW of simple cycle machine. There are plans to install two plants at two different sites, which haven't been confirmed yet, pending review by regulatory commissions. PG and E is looking for 400 MW combined output with roughly 75 percent of the capacity gas turbine, for siting in the San Francisco Bay area, probably at the existing Potrero generating station. Plant cost is figured at around $350 per KW installed, burning No. 2 diesel oil at a cost of $2.50 per million Btu. Operating expenses of 1.13 cents per kW fixed costs, and 4.88 cents variable costs for total of 6.01 cents per kWh are predicted.

Key concepts: Gas turbines, Engineering, Environmental science, Power station, Natural gas, Waste management, Electrical engineering, Mechanical engineering