1998ACI Concrete InternationalRequires access

Performance of a Concrete Pavement Overlay

Yong Jiang

Open publisher page 0 citations

Abstract

This study evaluated the performance of a concrete overlay project in Indiana, located on I-69 from SR-18 to 5.6 miles (9 km) north of SR-18. A 10-inch (255 mm) thick unbonded concrete overlay was placed in 1986 and 1987. The annual average daily traffic (AADT) on the four-lane highway was 18,870, with 28 percent truck volume. The original jointed concrete pavement was badly D cracked (major surface distress due to freeze-thaw) and had been resurfaced with a bituminous overlay. The performance of the unbonded concrete overlay has been monitored since 1987. Pavement roughness, friction, and deflection were measured and visual inspections of the pavement distresses were conducted. This article presents the study results of the performance of the concrete overlay during the 8-year period after construction.

About this research paper

What this paper is about

This study evaluated the performance of a concrete overlay project in Indiana, located on I-69 from SR-18 to 5.6 miles (9 km) north of SR-18. A 10-inch (255 mm) thick unbonded concrete overlay was placed in 1986 and 1987. The annual average daily traffic (AADT) on the four-lane highway was 18,870, with 28 percent truck volume. The original jointed concrete pavement was badly D cracked (major surface distress due to freeze-thaw) and had been resurfaced with a bituminous overlay. The performance of the unbonded concrete overlay has been monitored since 1987. Pavement roughness, friction, and deflection were measured and visual inspections of the pavement distresses were conducted. This article presents the study results of the performance of the concrete overlay during the 8-year period after construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This study evaluated the performance of a concrete overlay project in Indiana, located on I-69 from SR-18 to 5.6 miles (9 km) north of SR-18. A 10-inch (255 mm) thick unbonded concrete overlay was placed in 1986 and 1987. The annual average daily traffic (AADT) on the four-lane highway was 18,870, with 28 percent truck volume. The original jointed concrete pavement was badly D cracked (major surface distress due to freeze-thaw) and had been resurfaced with a bituminous overlay. The performance of the unbonded concrete overlay has been monitored since 1987. Pavement roughness, friction, and deflection were measured and visual inspections of the pavement distresses were conducted. This article presents the study results of the performance of the concrete overlay during the 8-year period after construction.

Key concepts: Overlay, Geotechnical engineering, Deflection (physics), Truck, Asphalt, Surface finish, Engineering, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Performance of a Concrete Pavement Overlay — Research Paper | ScholarLens