Constructed wetland system was studied to treat wastewater from industrial complex in rural area. Pilot plant at the Baeksuk Nongkong Danzi in Chunahn-City was used for field study. For the DO, the effluent concentration was higher than the influent concentration and it implies that natural reaeration supplies enough oxygen to the system. For the SS, the effluent concentration was consistently lower than the water quality standard even though the influent concentration varied significantly, which showed that SS was removed by the system effectively which is consist of soil and plants. For the BOD and COD, the average removal rate of them were 56% and 43%, respectively, therefore, the effluent concentration could not meet water quality standards when influent concentration was high. The removal rate of BOD and COD can be improved by supplemental treatment in addition to this system if necessary. For the T-N and T-P, the influent concentration of them were lower than the water quality standards than no further treatment was needed. Overall, the result showed that constructed wetland system is a feasible alternative for the treatment of wastewater from industrial complex in rural area. For actual application of this system, further study on design factors including loading rate, removal mechanism, and temperature effects is required to meet water quality standard consistently. Compared to existing systems, this system is quite competitive because it requires low capital cost, almost no energy and maintenance, and therefore, very cost effective.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Constructed wetland system was studied to treat wastewater from industrial complex in rural area. Pilot plant at the Baeksuk Nongkong Danzi in Chunahn-City was used for field study. For the DO, the effluent concentration was higher than the influent concentration and it implies that natural reaeration supplies enough oxygen to the system. For the SS, the effluent concentration was consistently lower than the water quality standard even though the influent concentration varied significantly, which showed that SS was removed by the system effectively which is consist of soil and plants. For the BOD and COD, the average removal rate of them were 56% and 43%, respectively, therefore, the effluent concentration could not meet water quality standards when influent concentration was high. The removal rate of BOD and COD can be improved by supplemental treatment in addition to this system if necessary. For the T-N and T-P, the influent concentration of them were lower than the water quality standards than no further treatment was needed. Overall, the result showed that constructed wetland system is a feasible alternative for the treatment of wastewater from industrial complex in rural area. For actual application of this system, further study on design factors including loading rate, removal mechanism, and temperature effects is required to meet water quality standard consistently. Compared to existing systems, this system is quite competitive because it requires low capital cost, almost no energy and maintenance, and therefore, very cost effective.
Key concepts: Effluent, Environmental science, Environmental engineering, Wetland, Wastewater, Water quality, Constructed wetland, Sewage treatment