Booby Traps for Young Engineers on Construction

Edward A. Merill

Open publisher page 0 citations

Abstract

The Architect-Engineer’s participation in construction contract administration requires an understanding of the problems shared with the contractor. A mutual recognition and acceptance of the division of responsibility is essential the A-E for design and inspection, the contractor for construction procedures and safety. The degree of responsibility must be compatible with the contractual obligations of the parties. The A-E representative must not interfere with nor participate in the contractor’s work to avoid assuming responsibility or liability for claims by third parties. A case is cited as an example: an A-E was held for personal injury because he failed to stop work; later it was reversed on the ground that the cause was a matter of construction practice not under the A-E’s control. Also described is the effect of the right to stop work on potential liability.

About this research paper

What this paper is about

The Architect-Engineer’s participation in construction contract administration requires an understanding of the problems shared with the contractor. A mutual recognition and acceptance of the division of responsibility is essential the A-E for design and inspection, the contractor for construction procedures and safety. The degree of responsibility must be compatible with the contractual obligations of the parties. The A-E representative must not interfere with nor participate in the contractor’s work to avoid assuming responsibility or liability for claims by third parties. A case is cited as an example: an A-E was held for personal injury because he failed to stop work; later it was reversed on the ground that the cause was a matter of construction practice not under the A-E’s control. Also described is the effect of the right to stop work on potential liability.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Architect-Engineer’s participation in construction contract administration requires an understanding of the problems shared with the contractor. A mutual recognition and acceptance of the division of responsibility is essential the A-E for design and inspection, the contractor for construction procedures and safety. The degree of responsibility must be compatible with the contractual obligations of the parties. The A-E representative must not interfere with nor participate in the contractor’s work to avoid assuming responsibility or liability for claims by third parties. A case is cited as an example: an A-E was held for personal injury because he failed to stop work; later it was reversed on the ground that the cause was a matter of construction practice not under the A-E’s control. Also described is the effect of the right to stop work on potential liability.

Key concepts: Engineering, Construction management, Civil engineering, Forensic engineering, Construction engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Booby Traps for Young Engineers on Construction — Research Paper | ScholarLens