1974Traffic engineering & controlRequires access

THE BRADFORD BUS STUDY. 1. PROPOSALS AND PROGRESS

G B Parker

Open publisher page 0 citations

Abstract

Arising from the decision many years ago to build a transport interchange in Bradford, the Bradford bus study has been designed to fulfil a much wider need. The purpose of this article is to outline the basic form of the study and the progress up to the middle of 1974. A discussion of the background to the study design is given. From the outset it was considered that the planning of public transport should not be based solely upon the assumption of restraints on the use of cars. The study is being carried out in four parts; bus role study; bus costing study; bus routing study; and bus promotion study. The inter-relationship between these studies is shown and a description of their objectives and progress is given. By this detailed examination of the many facets of bus operations, costs and use, the study is expected to produce results useful not only to Bradford, but also to West Yorkshire and the nation. /TRRL/

About this research paper

What this paper is about

Arising from the decision many years ago to build a transport interchange in Bradford, the Bradford bus study has been designed to fulfil a much wider need. The purpose of this article is to outline the basic form of the study and the progress up to the middle of 1974. A discussion of the background to the study design is given. From the outset it was considered that the planning of public transport should not be based solely upon the assumption of restraints on the use of cars. The study is being carried out in four parts; bus role study; bus costing study; bus routing study; and bus promotion study. The inter-relationship between these studies is shown and a description of their objectives and progress is given. By this detailed examination of the many facets of bus operations, costs and use, the study is expected to produce results useful not only to Bradford, but also to West Yorkshire and the nation. /TRRL/

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Arising from the decision many years ago to build a transport interchange in Bradford, the Bradford bus study has been designed to fulfil a much wider need. The purpose of this article is to outline the basic form of the study and the progress up to the middle of 1974. A discussion of the background to the study design is given. From the outset it was considered that the planning of public transport should not be based solely upon the assumption of restraints on the use of cars. The study is being carried out in four parts; bus role study; bus costing study; bus routing study; and bus promotion study. The inter-relationship between these studies is shown and a description of their objectives and progress is given. By this detailed examination of the many facets of bus operations, costs and use, the study is expected to produce results useful not only to Bradford, but also to West Yorkshire and the nation. /TRRL/

Key concepts: Public transport, Transport engineering, Bus priority, Activity-based costing, Operations research, Local bus, Transportation planning, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
THE BRADFORD BUS STUDY. 1. PROPOSALS AND PROGRESS — Research Paper | ScholarLens