A 'Super Bowl' Approach to Mars Rover Touchdown Loads Analysis
Chia-Yen Peng, Gary Ortiz
Abstract
Chia-Yen Peng, Gary Ortiz
Abstract
Touchdown Driving Requirement: The mechanical system surface element shall be capable of facilitating a safe, stable landing at terrain angles up to 15 degrees, given an initial vertical velocity of 1 m/sec, horizontal velocity of 0.5 m/sec, and Z-axis spin rate of [4] deg/sec.Touchdown Loads Development: A multi-year development effort has been successfully conducted leading to an innovative analytical methodology for the prediction of rover touchdown design loads and the assessment of rover touchdown stability.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Touchdown Driving Requirement: The mechanical system surface element shall be capable of facilitating a safe, stable landing at terrain angles up to 15 degrees, given an initial vertical velocity of 1 m/sec, horizontal velocity of 0.5 m/sec, and Z-axis spin rate of [4] deg/sec.Touchdown Loads Development: A multi-year development effort has been successfully conducted leading to an innovative analytical methodology for the prediction of rover touchdown design loads and the assessment of rover touchdown stability.
Key concepts: Touchdown, Terrain, Mars Exploration Program, Geology, Geodesy, Aerospace engineering, Simulation, Engineering