1982OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

M-6 steam drive project review report

R. Cerrada, Fernando Marc Enrique Ramirez Puig

Open publisher page 0 citations

Abstract

A review of the status and experiences gained in the M-6 steam drive project after 3 yr of steam injection is presented. The M-6 project is being conducted in a fully depleted heavy oil reservoir of Venezuela Bolivar Coast field, and comprises 151 wells of which 19 are injectors. The review is based on the overall project performance and describes operational problems, steam plant performance, production forecast and special data acquisition. After a total of ca 7.8 x 106 metric tons of steam injected, steam breakthrough has been observed in some hexagons. Remedial shut off in oil production wells have performed successfully. The M-6 project continues to provide useful experience and information which will be used in planning future steam drive projects in the heavy oil reservoirs of the Bolivar Coast.

About this research paper

What this paper is about

A review of the status and experiences gained in the M-6 steam drive project after 3 yr of steam injection is presented. The M-6 project is being conducted in a fully depleted heavy oil reservoir of Venezuela Bolivar Coast field, and comprises 151 wells of which 19 are injectors. The review is based on the overall project performance and describes operational problems, steam plant performance, production forecast and special data acquisition. After a total of ca 7.8 x 106 metric tons of steam injected, steam breakthrough has been observed in some hexagons. Remedial shut off in oil production wells have performed successfully. The M-6 project continues to provide useful experience and information which will be used in planning future steam drive projects in the heavy oil reservoirs of the Bolivar Coast.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A review of the status and experiences gained in the M-6 steam drive project after 3 yr of steam injection is presented. The M-6 project is being conducted in a fully depleted heavy oil reservoir of Venezuela Bolivar Coast field, and comprises 151 wells of which 19 are injectors. The review is based on the overall project performance and describes operational problems, steam plant performance, production forecast and special data acquisition. After a total of ca 7.8 x 106 metric tons of steam injected, steam breakthrough has been observed in some hexagons. Remedial shut off in oil production wells have performed successfully. The M-6 project continues to provide useful experience and information which will be used in planning future steam drive projects in the heavy oil reservoirs of the Bolivar Coast.

Key concepts: Steam injection, Petroleum engineering, Engineering, Shut down, Injector, Remedial action, Oil production, Waste management

Related papers

Back to paper searchBrowse research topicsOriginal source
M-6 steam drive project review report — Research Paper | ScholarLens