1973Railway track and structuresRequires access

DOUBLE SHIFTING RAIL-LAYING EQUIPMENT--WHAT ARE THE ECONOMIC FACTORS

G E Grogan

Open publisher page 0 citations

Abstract

The author states that the same general principles used here to develop the economics of double-shifting rail-laying equipment may also be applied to the double-shifting of other operations, such as track surfacing and tie renewals. A second shift for a rail-laying operation can be practicable, but seldom economical. As an alternative to hiring a second shift, paying indirect fringe benefits and assuming a host of potentially irksome details, working shift No. 1 a slightly longer period is considered.

About this research paper

What this paper is about

The author states that the same general principles used here to develop the economics of double-shifting rail-laying equipment may also be applied to the double-shifting of other operations, such as track surfacing and tie renewals. A second shift for a rail-laying operation can be practicable, but seldom economical. As an alternative to hiring a second shift, paying indirect fringe benefits and assuming a host of potentially irksome details, working shift No. 1 a slightly longer period is considered.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The author states that the same general principles used here to develop the economics of double-shifting rail-laying equipment may also be applied to the double-shifting of other operations, such as track surfacing and tie renewals. A second shift for a rail-laying operation can be practicable, but seldom economical. As an alternative to hiring a second shift, paying indirect fringe benefits and assuming a host of potentially irksome details, working shift No. 1 a slightly longer period is considered.

Key concepts: Laying, Track (disk drive), Engineering, Transport engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
DOUBLE SHIFTING RAIL-LAYING EQUIPMENT--WHAT ARE THE ECONOMIC FACTORS — Research Paper | ScholarLens