1992Journal of the Korean Society of Surveying Geodesy Photogrammetry and CartographyRequires access

Computational Maintenance on the Official Coordinates Revision in the Korean Triangulation Stations

Jae-Hwa Choi, Young‐Jin Lee, Yunsoo Choi

Open publisher page 0 citations

Abstract

The Korean triangulation network was established for 7 years from 1940 to 1916, the official coordinates of the stations were based on Tokyo Datum. But, most of the triangulation points, were destroyed during the Korean War, was re-established or re-arranged. The National Geography Institute(NGI) is now executing primary and secondary precise control survey projects with Electronic Distance Measuring equipments, which have average side lengths of 10 Km/2.5 Km. In this study, the revision method of the official coordinates is proposed that the combination of the primary and secondary precise control network is appropriate to new densification adjustments based on the computational schems of the original triangulation framework. And, the redefinition systems of Korean Datum is are also proposed in future networks.

About this research paper

What this paper is about

The Korean triangulation network was established for 7 years from 1940 to 1916, the official coordinates of the stations were based on Tokyo Datum. But, most of the triangulation points, were destroyed during the Korean War, was re-established or re-arranged. The National Geography Institute(NGI) is now executing primary and secondary precise control survey projects with Electronic Distance Measuring equipments, which have average side lengths of 10 Km/2.5 Km. In this study, the revision method of the official coordinates is proposed that the combination of the primary and secondary precise control network is appropriate to new densification adjustments based on the computational schems of the original triangulation framework. And, the redefinition systems of Korean Datum is are also proposed in future networks.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Korean triangulation network was established for 7 years from 1940 to 1916, the official coordinates of the stations were based on Tokyo Datum. But, most of the triangulation points, were destroyed during the Korean War, was re-established or re-arranged. The National Geography Institute(NGI) is now executing primary and secondary precise control survey projects with Electronic Distance Measuring equipments, which have average side lengths of 10 Km/2.5 Km. In this study, the revision method of the official coordinates is proposed that the combination of the primary and secondary precise control network is appropriate to new densification adjustments based on the computational schems of the original triangulation framework. And, the redefinition systems of Korean Datum is are also proposed in future networks.

Key concepts: Triangulation, Geodetic datum, Control network, Computer science, Geodesy, Geography, Control (management), Operations research

Related papers

Back to paper searchBrowse research topicsOriginal source
Computational Maintenance on the Official Coordinates Revision in the Korean Triangulation Stations — Research Paper | ScholarLens