CORRECTING PAVEMENT PUMPING BY MUD JACKING-INDIANA

Robert E. Frost

Open publisher page 0 citations

Abstract

A SECTION OF ROAD WAS SELECTED FOR OBSERVATION IN WHICH VARIOUS MIXES OF SOIL, CEMENT, AND BITUMINOUS MATERIALS WERE TO BE FORCED UNDER SOME OF THE SLABS THAT HAD SETTLED DUE TO PUMPING ACTION. FIFTY PUMPING JOINTS WERE TREATED BY MUD-JACKING. CONCLUSIONS INCLUDED: (1) PUMPING REQUIRES THREE CONDITIONS, A SUBGRADE CONSISTING OF A RELATIVELY PLASTIC AND IMPERVIOUS CLAY ON SILTY-CLAY SOIL, HEAVILY LOADED VEHICLES, AND A HIGH MOISTURE CONTENT; (2) ALL EXPERIMENTAL SUBGRADE TREATMENTS HAVE SUCCEEDED IN MINIMIZING OR PREVENTING PUMPING; (3) TREATMENT BY MUDJACKING REDUCED THE EXPECTED INCREASE IN 2-YEAR CRACKS; (4) MUDJACKING WAS SUCCESSFUL IN REDUCING THE AVERAGE SETTLEMENT OF SLABS AT PUMPING JOINTS; (5) DATA IS TOO LIMITED TO RECOMMEND MUDJACKING OPERATIONAL PROCEDURES.

About this research paper

What this paper is about

A SECTION OF ROAD WAS SELECTED FOR OBSERVATION IN WHICH VARIOUS MIXES OF SOIL, CEMENT, AND BITUMINOUS MATERIALS WERE TO BE FORCED UNDER SOME OF THE SLABS THAT HAD SETTLED DUE TO PUMPING ACTION. FIFTY PUMPING JOINTS WERE TREATED BY MUD-JACKING. CONCLUSIONS INCLUDED: (1) PUMPING REQUIRES THREE CONDITIONS, A SUBGRADE CONSISTING OF A RELATIVELY PLASTIC AND IMPERVIOUS CLAY ON SILTY-CLAY SOIL, HEAVILY LOADED VEHICLES, AND A HIGH MOISTURE CONTENT; (2) ALL EXPERIMENTAL SUBGRADE TREATMENTS HAVE SUCCEEDED IN MINIMIZING OR PREVENTING PUMPING; (3) TREATMENT BY MUDJACKING REDUCED THE EXPECTED INCREASE IN 2-YEAR CRACKS; (4) MUDJACKING WAS SUCCESSFUL IN REDUCING THE AVERAGE SETTLEMENT OF SLABS AT PUMPING JOINTS; (5) DATA IS TOO LIMITED TO RECOMMEND MUDJACKING OPERATIONAL PROCEDURES.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A SECTION OF ROAD WAS SELECTED FOR OBSERVATION IN WHICH VARIOUS MIXES OF SOIL, CEMENT, AND BITUMINOUS MATERIALS WERE TO BE FORCED UNDER SOME OF THE SLABS THAT HAD SETTLED DUE TO PUMPING ACTION. FIFTY PUMPING JOINTS WERE TREATED BY MUD-JACKING. CONCLUSIONS INCLUDED: (1) PUMPING REQUIRES THREE CONDITIONS, A SUBGRADE CONSISTING OF A RELATIVELY PLASTIC AND IMPERVIOUS CLAY ON SILTY-CLAY SOIL, HEAVILY LOADED VEHICLES, AND A HIGH MOISTURE CONTENT; (2) ALL EXPERIMENTAL SUBGRADE TREATMENTS HAVE SUCCEEDED IN MINIMIZING OR PREVENTING PUMPING; (3) TREATMENT BY MUDJACKING REDUCED THE EXPECTED INCREASE IN 2-YEAR CRACKS; (4) MUDJACKING WAS SUCCESSFUL IN REDUCING THE AVERAGE SETTLEMENT OF SLABS AT PUMPING JOINTS; (5) DATA IS TOO LIMITED TO RECOMMEND MUDJACKING OPERATIONAL PROCEDURES.

Key concepts: Jacking, Subgrade, Geotechnical engineering, Impervious surface, Settlement (finance), Moisture, Environmental science, Cement