1978•Railway track and structuresRequires access

INTERIM REPORT ON FAST. PERFORMANCE EVALUATION: WOOD-TIE AND CONCRETE-TIE TRACK AT 150 MGT

Andrew Kish, F E Dean

Open publisher page 0 citations

Abstract

The article reports on the results of experiments on the performance of track under an accumulated tonnage of 150 MGT. These tests are conducted on the FAST (Facility for Accelerated Service Testing) test circuit at Pueblo, Colorado, in the United States.

About this research paper

What this paper is about

The article reports on the results of experiments on the performance of track under an accumulated tonnage of 150 MGT. These tests are conducted on the FAST (Facility for Accelerated Service Testing) test circuit at Pueblo, Colorado, in the United States.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The article reports on the results of experiments on the performance of track under an accumulated tonnage of 150 MGT. These tests are conducted on the FAST (Facility for Accelerated Service Testing) test circuit at Pueblo, Colorado, in the United States.

Key concepts: Tonnage, Track (disk drive), Engineering, Interim, Test (biology), Forensic engineering, Civil engineering, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
INTERIM REPORT ON FAST. PERFORMANCE EVALUATION: WOOD-TIE AND CONCRETE-TIE TRACK AT 150 MGT — Research Paper | ScholarLens