2004Unpublished venueRequires access

Recycling of asphalt pavements

J Ramanujam

Open publisher page 3 citations

Abstract

Hot in-place asphalt recycling has gained wider usage in Queensland since its introduction in March 1990. An area of approximately 2,000,000m2 has been recycled so far. The hot in-place process in Queensland involves a recycling unit which is known as the Wirtgen remixer. This machine can remove, modify and relay damaged asphalt surface in a single operation. Many reasons have been put forward for insitu asphalt recycling. These include increasing costs of new pavement materials, shortage of good quality aggregates, haulage costs to and from quarries, conservation of natural resources, energy conservation and geometric limitations of existing urban roads. The Department of Main Roads, Queensland has been extensively involved in the design, construction and performance monitoring of hot in-place asphalt recycling treatment. Design and construction methods are being constantly reviewed in order to obtain a quality end product. Performance test results to date have given us the insight into the advantages and disadvantages of this technique. This paper highlights the Departments experience in the areas of design, construction and performance of the hot in-place asphalt recycling rehabilitation technique.

About this research paper

What this paper is about

Hot in-place asphalt recycling has gained wider usage in Queensland since its introduction in March 1990. An area of approximately 2,000,000m2 has been recycled so far. The hot in-place process in Queensland involves a recycling unit which is known as the Wirtgen remixer. This machine can remove, modify and relay damaged asphalt surface in a single operation. Many reasons have been put forward for insitu asphalt recycling. These include increasing costs of new pavement materials, shortage of good quality aggregates, haulage costs to and from quarries, conservation of natural resources, energy conservation and geometric limitations of existing urban roads. The Department of Main Roads, Queensland has been extensively involved in the design, construction and performance monitoring of hot in-place asphalt recycling treatment. Design and construction methods are being constantly reviewed in order to obtain a quality end product. Performance test results to date have given us the insight into the advantages and disadvantages of this technique. This paper highlights the Departments experience in the areas of design, construction and performance of the hot in-place asphalt recycling rehabilitation technique.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Hot in-place asphalt recycling has gained wider usage in Queensland since its introduction in March 1990. An area of approximately 2,000,000m2 has been recycled so far. The hot in-place process in Queensland involves a recycling unit which is known as the Wirtgen remixer. This machine can remove, modify and relay damaged asphalt surface in a single operation. Many reasons have been put forward for insitu asphalt recycling. These include increasing costs of new pavement materials, shortage of good quality aggregates, haulage costs to and from quarries, conservation of natural resources, energy conservation and geometric limitations of existing urban roads. The Department of Main Roads, Queensland has been extensively involved in the design, construction and performance monitoring of hot in-place asphalt recycling treatment. Design and construction methods are being constantly reviewed in order to obtain a quality end product. Performance test results to date have given us the insight into the advantages and disadvantages of this technique. This paper highlights the Departments experience in the areas of design, construction and performance of the hot in-place asphalt recycling rehabilitation technique.

Key concepts: Haulage, Asphalt, Engineering, Economic shortage, Civil engineering, Quality (philosophy), Product (mathematics), Unit (ring theory)

Related papers

Back to paper searchBrowse research topicsOriginal source
Recycling of asphalt pavements — Research Paper | ScholarLens