1979•OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

First US LNG base load trade from Algeria, the Cove Point Operation

J.W. Kime, John W. Boylston, Jessica Dyke

Open publisher page 0 citations

Abstract

The Algeria 1 LNG project, by far the largest LNG-import project in the world, has proved a beneficial source of energy for the Atlantic Coast states, owing to extensive crew training, good terminal-operating procedures, and US Coast Guard monitoring procedures. Participating in the project with El Paso Marine Co. are Columbia LNG Corp. and Consolidated System LNG Co., which receive about two-thirds of the shipments at Cover Point, Md., and Southern Energy Co., which receives the balance at Elba Island, Ga. The Algeria 1 ship fleet consists of nine 125,000 cu m vessels each carrying the equivalent of 2.6 billion cu ft of natural gas; together, they make about 142 round-trips per year; each takes 20 days, including a 24 hr turnaround.

About this research paper

What this paper is about

The Algeria 1 LNG project, by far the largest LNG-import project in the world, has proved a beneficial source of energy for the Atlantic Coast states, owing to extensive crew training, good terminal-operating procedures, and US Coast Guard monitoring procedures. Participating in the project with El Paso Marine Co. are Columbia LNG Corp. and Consolidated System LNG Co., which receive about two-thirds of the shipments at Cover Point, Md., and Southern Energy Co., which receives the balance at Elba Island, Ga. The Algeria 1 ship fleet consists of nine 125,000 cu m vessels each carrying the equivalent of 2.6 billion cu ft of natural gas; together, they make about 142 round-trips per year; each takes 20 days, including a 24 hr turnaround.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Algeria 1 LNG project, by far the largest LNG-import project in the world, has proved a beneficial source of energy for the Atlantic Coast states, owing to extensive crew training, good terminal-operating procedures, and US Coast Guard monitoring procedures. Participating in the project with El Paso Marine Co. are Columbia LNG Corp. and Consolidated System LNG Co., which receive about two-thirds of the shipments at Cover Point, Md., and Southern Energy Co., which receives the balance at Elba Island, Ga. The Algeria 1 ship fleet consists of nine 125,000 cu m vessels each carrying the equivalent of 2.6 billion cu ft of natural gas; together, they make about 142 round-trips per year; each takes 20 days, including a 24 hr turnaround.

Key concepts: Coast guard, Liquefied natural gas, Crew, Cove, Natural gas, Engineering, Environmental science, Geography

Related papers

Back to paper searchBrowse research topicsOriginal source
First US LNG base load trade from Algeria, the Cove Point Operation — Research Paper | ScholarLens