URETEK Stitch-In-Time®

Keith W Anderson, Linda M. Pierce, Jeffrey S Uhlmeyer

Open publisher page 1 citations

Abstract

A section of portland cement concrete (PCC) pavement on Interstate 5 near Tacoma was the site of an experimental installation of the URETEK® Method of undersealing and the URETEK® Process called Stitch-In-Time for restoring load transfer to PCC pavements. After six years, the average load transfer efficiency of the 15 movable Stitch-In-Time joints, called accumulator joints, is 38%. In contrast, the average load transfer efficiency of the dowel bar retrofit joints installed at the same time is 82%. The URETEK undersealing method is doing an excellent job of supporting all of the panels in the experimental section. However, there is considerable cracking and spalling in the locked joints that are located between accumulator joints indicating areas of high stress concentration. The Stitch-In-Time Process is not recommended as a viable method to restore load transfer in PCC pavements.

About this research paper

What this paper is about

A section of portland cement concrete (PCC) pavement on Interstate 5 near Tacoma was the site of an experimental installation of the URETEK® Method of undersealing and the URETEK® Process called Stitch-In-Time for restoring load transfer to PCC pavements. After six years, the average load transfer efficiency of the 15 movable Stitch-In-Time joints, called accumulator joints, is 38%. In contrast, the average load transfer efficiency of the dowel bar retrofit joints installed at the same time is 82%. The URETEK undersealing method is doing an excellent job of supporting all of the panels in the experimental section. However, there is considerable cracking and spalling in the locked joints that are located between accumulator joints indicating areas of high stress concentration. The Stitch-In-Time Process is not recommended as a viable method to restore load transfer in PCC pavements.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A section of portland cement concrete (PCC) pavement on Interstate 5 near Tacoma was the site of an experimental installation of the URETEK® Method of undersealing and the URETEK® Process called Stitch-In-Time for restoring load transfer to PCC pavements. After six years, the average load transfer efficiency of the 15 movable Stitch-In-Time joints, called accumulator joints, is 38%. In contrast, the average load transfer efficiency of the dowel bar retrofit joints installed at the same time is 82%. The URETEK undersealing method is doing an excellent job of supporting all of the panels in the experimental section. However, there is considerable cracking and spalling in the locked joints that are located between accumulator joints indicating areas of high stress concentration. The Stitch-In-Time Process is not recommended as a viable method to restore load transfer in PCC pavements.

Key concepts: Spall, Dowel, Cracking, Accumulator (cryptography), Structural engineering, Transfer (computing), Engineering, Geotechnical engineering