HPC BRIDGE DECK IN NEBRASKA

Michael W. Beacham

Open publisher page 8 citations

Abstract

Based on the information gleaned from this project, the Nebraska Department of Roads (NDOR) Bridge Division, in conjunction with the Material & Test Division, developed a High-Performance Concrete Strategic Plan for the future. With respect to deck concrete, the plan provides a transition from traditional concrete mix designs to a higher performing design, which should translate into more durable decks. The Sarpy County project has demonstrated that HPC can be mixed, transported, placed, finished and cured with relative ease. Nebraska is committed to using HPC in the future because of its potential to extend the life of bridges.

About this research paper

What this paper is about

Based on the information gleaned from this project, the Nebraska Department of Roads (NDOR) Bridge Division, in conjunction with the Material & Test Division, developed a High-Performance Concrete Strategic Plan for the future. With respect to deck concrete, the plan provides a transition from traditional concrete mix designs to a higher performing design, which should translate into more durable decks. The Sarpy County project has demonstrated that HPC can be mixed, transported, placed, finished and cured with relative ease. Nebraska is committed to using HPC in the future because of its potential to extend the life of bridges.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the information gleaned from this project, the Nebraska Department of Roads (NDOR) Bridge Division, in conjunction with the Material & Test Division, developed a High-Performance Concrete Strategic Plan for the future. With respect to deck concrete, the plan provides a transition from traditional concrete mix designs to a higher performing design, which should translate into more durable decks. The Sarpy County project has demonstrated that HPC can be mixed, transported, placed, finished and cured with relative ease. Nebraska is committed to using HPC in the future because of its potential to extend the life of bridges.

Key concepts: Deck, Bridge deck, Bridge (graph theory), Plan (archaeology), Engineering, Division (mathematics), Forensic engineering, Test plan

Related papers

Back to paper searchBrowse research topicsOriginal source
HPC BRIDGE DECK IN NEBRASKA — Research Paper | ScholarLens